Difference between revisions of "Staff Priorities - Fabio"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday ==
 
== Yesterday ==
  
* Winter Break
+
* Reply to software @ scec
 +
* Call with JB
 +
** Magnitude/Area Scaling Study
 +
** New M 7.0 SRC/STL files
 +
* Talked to DG regarding UCVM implementation
 +
** Replied to KO, RG regarding Vs/Vp's used for High-F
 +
* Finished Part-A simulations for SGS
 +
* Started looking into GMPEs from SR
  
 
== Today ==
 
== Today ==
  
* Respond to several e-mails
+
* Plots for SGS
** software @ scec
+
* Start simulations for JB on HPCC
** JB wants simulations
+
* GMPE implementation for SR code
* Call with RG
 
** Plot RWG data against other groups
 
** Verify model obtained from RG with DG
 
* E-mail from SR with matlab code for GMPEs
 
** Look into it and implement.. in preparation for workshop
 
* Create Part-A plots for SGS
 
  
 
== Blocked: ==
 
== Blocked: ==

Revision as of 18:09, 7 January 2016

Yesterday

  • Reply to software @ scec
  • Call with JB
    • Magnitude/Area Scaling Study
    • New M 7.0 SRC/STL files
  • Talked to DG regarding UCVM implementation
    • Replied to KO, RG regarding Vs/Vp's used for High-F
  • Finished Part-A simulations for SGS
  • Started looking into GMPEs from SR

Today

  • Plots for SGS
  • Start simulations for JB on HPCC
  • GMPE implementation for SR code

Blocked:

  • No

Followups:

  • No

To Do:

Short Term

Broadband Platform

  • Update GP rupture generator - Total: 3 days
    • Sent Rob parameters - done
    • Integrate code - 1 day
    • Run tests for Part-A / Part-B - 2 days
  • Anderson GoF code from AS - Total: 3 days
    • Analyze code, dependencies, provide AS feedback: 1 day
    • Convert code to BBP module, add module to BBP workflow: 1 day
    • Test BBP platform, produce new metrics: 1 day
  • New BBToolbox version available from SDSU - Total: 3 days
    • Incorporate SDSU changes into BBToolbox: 1 day
    • Run Part-A/Part-B validations: 2 days
  • NGA-West 2 validation on BBP - Total: 6 days
    • Contact CG, collect input scenarios: 1 day
    • Write test code: 1 day
    • Run tests: 2 days
    • Review results: 2 days
  • Setup laptop as EEW machine in software lab - Total: 1 day
    • Erase laptop, install clean Mac OS X, install EEW software: 1 day
  • Integrate Rupture Generator code from SG - Total: 28 days
    • Review code, understand inputs/outputs, run outside platform: 1 day
    • Run Part-A problem using Matlab code, review results: 1 day
    • Migrate code into BBP Platform, convert Matlab code into Python/C/Fortran, test: 20 days
    • Run Part-A/Part-B validation exercise on HPCC: 5 days (contingent on code performance)

High-F

  • Set up High-F code repository - Total: 3 days
    • Collect codes from groups, scripts - 1 day
    • Select SVN/Github repository - 1 day
    • Create repository - 1 day
  • Understand how to map station location to grid point - Total: 2 days
    • Understand approaches used by AWP and Hercules to map station location to grid point - 1 day
    • Discuss with PM, DG, how to use UCVM to do this mapping - 1 day

Medium Term

  • Package GF generation code from RG into BBP Platform
  • New raytracing code for SDSU method
  • Update Anderson method
  • Try logging into Gordon