Difference between revisions of "Staff Priorities - Fabio"
From SCECpedia
Jump to navigationJump to searchLine 1: | Line 1: | ||
== Yesterday == | == Yesterday == | ||
− | * | + | * Reply to software @ scec |
+ | * Call with JB | ||
+ | ** Magnitude/Area Scaling Study | ||
+ | ** New M 7.0 SRC/STL files | ||
+ | * Talked to DG regarding UCVM implementation | ||
+ | ** Replied to KO, RG regarding Vs/Vp's used for High-F | ||
+ | * Finished Part-A simulations for SGS | ||
+ | * Started looking into GMPEs from SR | ||
== Today == | == Today == | ||
− | * | + | * Plots for SGS |
− | * | + | * Start simulations for JB on HPCC |
− | + | * GMPE implementation for SR code | |
− | * | ||
− | |||
− | |||
− | |||
− | |||
− | |||
== Blocked: == | == Blocked: == |
Revision as of 18:09, 7 January 2016
Contents
Yesterday
- Reply to software @ scec
- Call with JB
- Magnitude/Area Scaling Study
- New M 7.0 SRC/STL files
- Talked to DG regarding UCVM implementation
- Replied to KO, RG regarding Vs/Vp's used for High-F
- Finished Part-A simulations for SGS
- Started looking into GMPEs from SR
Today
- Plots for SGS
- Start simulations for JB on HPCC
- GMPE implementation for SR code
Blocked:
- No
Followups:
- No
To Do:
Short Term
Broadband Platform
- Update GP rupture generator - Total: 3 days
- Sent Rob parameters - done
- Integrate code - 1 day
- Run tests for Part-A / Part-B - 2 days
- Anderson GoF code from AS - Total: 3 days
- Analyze code, dependencies, provide AS feedback: 1 day
- Convert code to BBP module, add module to BBP workflow: 1 day
- Test BBP platform, produce new metrics: 1 day
- New BBToolbox version available from SDSU - Total: 3 days
- Incorporate SDSU changes into BBToolbox: 1 day
- Run Part-A/Part-B validations: 2 days
- NGA-West 2 validation on BBP - Total: 6 days
- Contact CG, collect input scenarios: 1 day
- Write test code: 1 day
- Run tests: 2 days
- Review results: 2 days
- Setup laptop as EEW machine in software lab - Total: 1 day
- Erase laptop, install clean Mac OS X, install EEW software: 1 day
- Integrate Rupture Generator code from SG - Total: 28 days
- Review code, understand inputs/outputs, run outside platform: 1 day
- Run Part-A problem using Matlab code, review results: 1 day
- Migrate code into BBP Platform, convert Matlab code into Python/C/Fortran, test: 20 days
- Run Part-A/Part-B validation exercise on HPCC: 5 days (contingent on code performance)
High-F
- Set up High-F code repository - Total: 3 days
- Collect codes from groups, scripts - 1 day
- Select SVN/Github repository - 1 day
- Create repository - 1 day
- Understand how to map station location to grid point - Total: 2 days
- Understand approaches used by AWP and Hercules to map station location to grid point - 1 day
- Discuss with PM, DG, how to use UCVM to do this mapping - 1 day
Medium Term
- Package GF generation code from RG into BBP Platform
- New raytracing code for SDSU method
- Update Anderson method
- Try logging into Gordon