Difference between revisions of "Staff Priorities - Masha"

From SCECpedia
Jump to navigationJump to search
Line 9: Line 9:
 
** And another acceptance test to check for existing Bayesian forecasts before creating new ones
 
** And another acceptance test to check for existing Bayesian forecasts before creating new ones
 
** Add support for GZIP compression for Bayesian forecasts if compression is enabled
 
** Add support for GZIP compression for Bayesian forecasts if compression is enabled
* All testing centers (csep-cert, csep-op, transient) failed due to network issues with catalogs, SVN for catalogs. Sent email to John Y.
+
* All testing centers (csep-cert, csep-op, transient) failed due to network issues with catalogs download sites, SVN repos for catalogs. Sent email to John Y.
  
 
'''Blocked''': No
 
'''Blocked''': No

Revision as of 18:09, 14 March 2016

Current Activities

Yesterday

  • Got acceptance test to work for Trac ticket #372: Support Bayesian ensemble models for one-day forecasts

Today

  • 10am meeting with Max about some details on Bayesian ensemble modeling within CSEP
  • Trac ticket #372: Support Bayesian ensemble models for one-day forecasts:
    • And another acceptance test to check for existing Bayesian forecasts before creating new ones
    • Add support for GZIP compression for Bayesian forecasts if compression is enabled
  • All testing centers (csep-cert, csep-op, transient) failed due to network issues with catalogs download sites, SVN repos for catalogs. Sent email to John Y.

Blocked: No

Followups: No

TODO

  • csep-op failure: evaluation was issued on the very first day of new one-year Global forecasts - should not be the case
  • Trac ticket #374: Remove temporary input catalog generated by CA ETASV12_10 model
  • Trac ticket #353: Optimize RELM N-test by avoiding event to bin look up when masking bit is set for the whole forecast

Responsiblities