== Yesterday == | == Yesterday == | ||
− | * | + | * High-F call |
− | ** | + | ** Updated stations matching previous study |
− | * | + | * Updated unit and acceptance tests |
− | ** | + | ** Code manipulating SRF files need upgrade |
− | * | + | ** GP: Rupture Generator, Low and High-Frequency tests |
− | * | + | ** UCSB: Site response update (toSAC code) |
− | * | + | * Running full Part-A and Part-B on HPCC |
− | + | ** Re-submitted failed runs | |
+ | * Sent Kim link to new runs | ||
== Today == | == Today == | ||
− | * | + | * Complete HPCC runs |
− | ** | + | ** Create plots (GP, RZZ, Anderson) |
− | ** | + | * Complete Unit and Acceptance tests |
− | * | + | ** New RMG unit test |
− | ** | + | ** Updated RZZ tests |
− | * | + | *** Send results to SR |
+ | ** Add check for Mac | ||
+ | * Close Trac tickets | ||
+ | ** Pending tests | ||
== Blocked: == | == Blocked: == |
Revision as of 17:14, 19 April 2016
Contents
Yesterday
- High-F call
- Updated stations matching previous study
- Updated unit and acceptance tests
- Code manipulating SRF files need upgrade
- GP: Rupture Generator, Low and High-Frequency tests
- UCSB: Site response update (toSAC code)
- Running full Part-A and Part-B on HPCC
- Re-submitted failed runs
- Sent Kim link to new runs
Today
- Complete HPCC runs
- Create plots (GP, RZZ, Anderson)
- Complete Unit and Acceptance tests
- New RMG unit test
- Updated RZZ tests
- Send results to SR
- Add check for Mac
- Close Trac tickets
- Pending tests
Blocked:
- No
Followups:
- No
To Do:
Short Term
Broadband Platform
- Update GP rupture generator - Total: 3 days
- Sent Rob parameters - done
- Integrate code - 1 day
- Run tests for Part-A / Part-B - 2 days
- Anderson GoF code from AS - Total: 3 days
- Analyze code, dependencies, provide AS feedback: 1 day
- Convert code to BBP module, add module to BBP workflow: 1 day
- Test BBP platform, produce new metrics: 1 day
- New BBToolbox version available from SDSU - Total: 3 days
- Incorporate SDSU changes into BBToolbox: 1 day
- Run Part-A/Part-B validations: 2 days
- NGA-West 2 validation on BBP - Total: 6 days
- Contact CG, collect input scenarios: 1 day
- Write test code: 1 day
- Run tests: 2 days
- Review results: 2 days
- Setup laptop as EEW machine in software lab - Total: 1 day
- Erase laptop, install clean Mac OS X, install EEW software: 1 day
- Integrate Rupture Generator code from SG - Total: 28 days
- Review code, understand inputs/outputs, run outside platform: 1 day
- Run Part-A problem using Matlab code, review results: 1 day
- Migrate code into BBP Platform, convert Matlab code into Python/C/Fortran, test: 20 days
- Run Part-A/Part-B validation exercise on HPCC: 5 days (contingent on code performance)
High-F
- Set up High-F code repository - Total: 3 days
- Collect codes from groups, scripts - 1 day
- Select SVN/Github repository - 1 day
- Create repository - 1 day
- Understand how to map station location to grid point - Total: 2 days
- Understand approaches used by AWP and Hercules to map station location to grid point - 1 day
- Discuss with PM, DG, how to use UCVM to do this mapping - 1 day
Medium Term
- Package GF generation code from RG into BBP Platform
- New raytracing code for SDSU method
- Update Anderson method
- Try logging into Gordon