Difference between revisions of "Staff Priorities - Scott"
From SCECpedia
Jump to navigationJump to searchLine 11: | Line 11: | ||
*Waveforms for the 1 site x 3 realizations that are Northridge-like | *Waveforms for the 1 site x 3 realizations that are Northridge-like | ||
*Overlay CA trace on fwd sim movie | *Overlay CA trace on fwd sim movie | ||
+ | *Change moment DB so all tables are MyISAM | ||
== Blocked == | == Blocked == |
Revision as of 23:01, 27 April 2016
Yesterday
- Regenerated missing ruptures
- 1 more Study 15.12 site done: 3 to go
- Populated Moment DB with missing tables
- Rob's SRF looks different; not sure why
Today
- Continue work on Study 15.12
- Investigate SRF problem with Rob
- CyberShake writeup to Christine with figure/images; pull out caption
- Waveforms for the 1 site x 3 realizations that are Northridge-like
- Overlay CA trace on fwd sim movie
- Change moment DB so all tables are MyISAM
Blocked
- No
Follow-ups
- No
Areas of Responsibilities
- CyberShake
- Broadband CyberShake
- Code migration