Difference between revisions of "Staff Priorities - Scott"
From SCECpedia
Jump to navigationJump to search (→Today) |
|||
Line 11: | Line 11: | ||
*Continue work on statewide 1 Hz SGT run: plot before and after smoothing to make sure it worked correctly | *Continue work on statewide 1 Hz SGT run: plot before and after smoothing to make sure it worked correctly | ||
*Generate NGA2 comparison curves (with RotD50) for 5 Study 15.12 sites | *Generate NGA2 comparison curves (with RotD50) for 5 Study 15.12 sites | ||
+ | *Get codes together for David and Billy | ||
*Check on PAS run | *Check on PAS run | ||
Revision as of 22:56, 20 May 2016
Yesterday
- Continue work on statewide 1 Hz SGT run - parallelized smoothing code
- Workflow presentation call
- Call with Phil on tomography
- Queued up PAS with rvsig1=0.1 to compare
Today
- Gather metrics from Study 15.12
- Document details of stochastic sims in Study 15.12 on wiki
- Figure out what to do about intern XSEDE accounts
- Continue work on statewide 1 Hz SGT run: plot before and after smoothing to make sure it worked correctly
- Generate NGA2 comparison curves (with RotD50) for 5 Study 15.12 sites
- Get codes together for David and Billy
- Check on PAS run
Blocked
- No
Follow-ups
- Tomography call at 11
Areas of Responsibilities
- CyberShake
- Broadband CyberShake
- Code migration