Difference between revisions of "Staff Priorities - Phil"

From SCECpedia
Jump to navigationJump to search
Line 6: Line 6:
 
* CG Special project summary
 
* CG Special project summary
 
* PM HPC and IT Planning
 
* PM HPC and IT Planning
*[http://hypocenter.usc.edu/research/CME/SLC_2016/ Presentation documents]
+
*[http://hypocenter.usc.edu/research/CME/SLM_2016/ SCEC Leadership Meeting Presentation documents]
 
* HighF/CyberShake Meeting
 
* HighF/CyberShake Meeting
  
 
== Today: ==
 
== Today: ==
 +
* Review BW Travel arrangements
 +
* Respond to BW ACI letter
 +
* SP touchbase 1030am
 +
* HighF/CyberShake followups
 
* Respond to NM UCVM request w/ DG
 
* Respond to NM UCVM request w/ DG
 
* Review CyberShake DB design notes from SC
 
* Review CyberShake DB design notes from SC
 
* Jian act with new BBP release
 
* Jian act with new BBP release
 
* Finalize CSEP Hardware purchase and backup status with JY/ML
 
* Finalize CSEP Hardware purchase and backup status with JY/ML
* Respond to BW ACI letter
+
* Add problem reporting to BBP site
  
 
== Blocked: ==
 
== Blocked: ==
Line 21: Line 25:
 
== Followups: ==
 
== Followups: ==
 
* UCVM development schedule with DG
 
* UCVM development schedule with DG
 +
* Fix BBP Trac
  
 
== Pending: ==
 
== Pending: ==
Line 28: Line 33:
 
* Toms' presidential address as SSA
 
* Toms' presidential address as SSA
 
* Research ps tech
 
* Research ps tech
* Create trac ticket for BBP 32 bit
 
  
 
== Related Entries ==
 
== Related Entries ==
 
*[[CME Project]]
 
*[[CME Project]]
 
*[[Staff]]
 
*[[Staff]]

Revision as of 16:55, 9 June 2016

Yesterday:

  • SCEC Leadership Meeting

For documents posted including:

  • 1 page ppt computational science presentation (ED)
  • 2 page word doc notes from computational science discussion session
  • CG Special project summary
  • PM HPC and IT Planning
  • SCEC Leadership Meeting Presentation documents
  • HighF/CyberShake Meeting

Today:

  • Review BW Travel arrangements
  • Respond to BW ACI letter
  • SP touchbase 1030am
  • HighF/CyberShake followups
  • Respond to NM UCVM request w/ DG
  • Review CyberShake DB design notes from SC
  • Jian act with new BBP release
  • Finalize CSEP Hardware purchase and backup status with JY/ML
  • Add problem reporting to BBP site

Blocked:

  • No

Followups:

  • UCVM development schedule with DG
  • Fix BBP Trac

Pending:

  • ABF into CME codebase
  • CFM DB Schema Review
  • Check on mis-labeled time series from NK
  • Toms' presidential address as SSA
  • Research ps tech

Related Entries