Difference between revisions of "Staff Priorities - Fabio"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday ==
 
== Yesterday ==
  
* Back from PyCon
+
* BBP call
* Receipts
+
** Multi-plane SRF plan
* Check mesh extraction job on Blue Waters
+
* Posted Irikura results from AP code
* Meeting with JY regarding counting downloads on hypocenter
+
** Sent bug report to AP
 +
** Received new version of code
 +
** Ran again all simulations on HPCC
 +
** Still bugs, sent new report
 +
* Talked to CG regarding High-F processing
 +
** Able to run the test from RT/SA
 +
** Got identical GMT plot, but different time series plots
 +
** Sent report to RT/AS
  
 
== Today ==
 
== Today ==
  
* Review AP revised Irikura code
+
* Work on High-F
* Integrate Irikura rupture generator on BBP
+
** Refactor processing code
* Run tests to make sure we can reproduce AP's results
+
** Run plot scripts with 3-stations used in High-F
* Run few SO CAL events on BBP server to validate code
+
** Hercules vs observations
 +
* Wait for new Irikura rupture generator code from AP
  
 
== Blocked: ==
 
== Blocked: ==
Line 19: Line 27:
 
== Followups: ==
 
== Followups: ==
  
* Allocation call @11am
+
* No
  
 
== To Do: ==
 
== To Do: ==

Revision as of 17:09, 20 June 2016

Yesterday

  • BBP call
    • Multi-plane SRF plan
  • Posted Irikura results from AP code
    • Sent bug report to AP
    • Received new version of code
    • Ran again all simulations on HPCC
    • Still bugs, sent new report
  • Talked to CG regarding High-F processing
    • Able to run the test from RT/SA
    • Got identical GMT plot, but different time series plots
    • Sent report to RT/AS

Today

  • Work on High-F
    • Refactor processing code
    • Run plot scripts with 3-stations used in High-F
    • Hercules vs observations
  • Wait for new Irikura rupture generator code from AP

Blocked:

  • No

Followups:

  • No

To Do:

Short Term

Broadband Platform

  • BBP Code updates needed before git migration
    • Remove GMT dependencies and files
    • Move to argparse
    • Simplify tests to use smaller files
    • Remove unused data files in tests directory
  • NGA-West 2 validation on BBP - Total: 6 days
    • Contact CG, collect input scenarios: 1 day
    • Write test code: 1 day
    • Run tests: 2 days
    • Review results: 2 days

High-F

  • Set up High-F code repository - Total: 3 days
    • Collect codes from groups, scripts - 1 day
    • Select SVN/Github repository - 1 day
    • Create repository - 1 day

Medium Term

  • Package GF generation code from RG into BBP Platform
  • New raytracing code for SDSU method
  • Update Anderson method
  • BBP Projects
  • Try logging into Gordon