Difference between revisions of "Staff Priorities - David"

From SCECpedia
Jump to navigationJump to search
Line 3: Line 3:
 
* Fixed SM issue:
 
* Fixed SM issue:
 
** Fortran string length, plus null termination
 
** Fortran string length, plus null termination
* Started looking into replicating EL plots<br />
+
** Needed extra libraries (15.10.0 needs ldl)
 +
** Updated code on wiki
 +
** Tested on Mac plus Linux
 +
* Pinged SC about CyberShake model
 +
* Started on replicating vertical slices from SRL paper
  
 
== Today ==
 
== Today ==
  
* Sent plots to CG<br />
+
* Finish replicating plots from SRL paper
* Verify 1D profile for UCVM (SCEC 1D)<br />
+
** LARSE sections through S4.26
* Replicate EL plots (faults)<br />
+
** Vertical slices through CCA
* Test UCVM elevation, depth capabilities<br />
+
* Check remaining models into GitHub
* Check remaining models into GitHub<br />
+
* Continue work on prototype new UCVM version
* High-F call at 11am
+
* Web discussion at 11am
  
 
== Blocked ==
 
== Blocked ==
Line 20: Line 24:
 
== Followups ==  
 
== Followups ==  
  
* High-F call
+
* Web call

Revision as of 17:08, 23 June 2016

Yesterday

  • Fixed SM issue:
    • Fortran string length, plus null termination
    • Needed extra libraries (15.10.0 needs ldl)
    • Updated code on wiki
    • Tested on Mac plus Linux
  • Pinged SC about CyberShake model
  • Started on replicating vertical slices from SRL paper

Today

  • Finish replicating plots from SRL paper
    • LARSE sections through S4.26
    • Vertical slices through CCA
  • Check remaining models into GitHub
  • Continue work on prototype new UCVM version
  • Web discussion at 11am

Blocked

  • No

Followups

  • Web call