Difference between revisions of "Staff Priorities - Scott"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday ==
 
== Yesterday ==
*Queued up jobs to create all src 115, rup 6 realizations to better match variations between v3.3.1 and v5.2.3
+
*Responded to Bruce
*Helped Bruce Shaw compile RSQSim on Blue Waters
+
*Installed ERF 41 rupture geometry files
*IDed comparison runs between different CyberShake studies for USC,SBSM,PAS,WNGC,STNI
+
*Determined SGTs must be regenerated for ERF 41
*Dumped Study 2.2 to sqlite db
+
*Generated comparison curves for 5 sites for ABF paper, emailed to Tom and Feng
 +
*Calculated hypos for src 115, rup 6
 +
*Continued sqlite dumps
 +
*Emailed SC16 registration
  
 
== Today ==
 
== Today ==
*Respond to Bruce
+
*Compare seismograms for best-matching hypos
*Install ERF 41 rupture geometry files
+
*Edit SC16 edu doc
*Decide if SGTs must be regenerated for ERF 41
 
*Generate comparison curves for 5 sites for ABF paper
 
*Calculate hypos for src 115, rup 6; find best match
 
*Look over SC16 edu doc
 
 
*Continue sqlite dumps
 
*Continue sqlite dumps
*Email SC16 registration
+
*Check on Titan test
  
 
== Blocked ==
 
== Blocked ==

Revision as of 15:41, 13 October 2016

Yesterday

  • Responded to Bruce
  • Installed ERF 41 rupture geometry files
  • Determined SGTs must be regenerated for ERF 41
  • Generated comparison curves for 5 sites for ABF paper, emailed to Tom and Feng
  • Calculated hypos for src 115, rup 6
  • Continued sqlite dumps
  • Emailed SC16 registration

Today

  • Compare seismograms for best-matching hypos
  • Edit SC16 edu doc
  • Continue sqlite dumps
  • Check on Titan test

Blocked

  • No

Follow-ups

  • Phil?

Areas of Responsibilities

  • CyberShake
  • Broadband CyberShake
  • Code migration