Difference between revisions of "Staff Priorities - Phil"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday: ==
 
== Yesterday: ==
* High-F 11am
+
1. High-F call – Discuss w/ FS about what they are waiting on from us.
* Precarious rock site requirements to EP/TH
+
2. Contacted 10NCEE simulation contributors about contributing to 11NCEE meeting
* Finalize SC travel
+
3. Setup in-person with Robert Streetman – Monday 12noon/1pm
* CyberShake call SC
+
4. Invite Bill Savran for interview -  June 26 preferred
* Proposed CyberShake production to science leads
+
5. Contact CMT about zero length catalog – resolved
* Confirmed Friday CyberShake Science review
+
6. Globus transfer issues w/ RWG – resolved using non-tcl command line version
 +
7. Figure out how to remove files I transfer to nearline during High-F call (involved uberftp from bw to bw nearline)
 +
8. Contact all BW nearline users, determined what needs to be saved, and ask BW to transfer only needed files to new project nearline – started by BW
 +
9. Call w/ RT on CXM development
 +
10. Call w/ JS on CXM development
 +
11. Forwarded a revised draft of OLCF 25th year highlights to THJ
 +
12. Started UCVM paper revisions
 +
 
  
 
== Today: ==
 
== Today: ==
* 930am call ANL
+
1. BBP Install – no md5sum on Mac
* 11am SI2 call
+
2. UCVM paper revisions – go to ES? (RT suggest yes)
* DG paperwork
+
3. Confirm WS interview on June 26th
* NCSA/ONLC review coord
+
4. Caltech datasock request
* PS response
+
5. Meeting with HR on workday tools
* BA email
+
6. Check on Z2.5 GMPE on CS17.3
 +
7. Review Software metrics from Github
 +
8. CSEP operations and planning – List of ops system fixes
 +
9. Interview planning – coding
 +
 
  
 
== Blocked: ==
 
== Blocked: ==

Revision as of 21:40, 13 June 2017

Yesterday:

1. High-F call – Discuss w/ FS about what they are waiting on from us. 2. Contacted 10NCEE simulation contributors about contributing to 11NCEE meeting 3. Setup in-person with Robert Streetman – Monday 12noon/1pm 4. Invite Bill Savran for interview - June 26 preferred 5. Contact CMT about zero length catalog – resolved 6. Globus transfer issues w/ RWG – resolved using non-tcl command line version 7. Figure out how to remove files I transfer to nearline during High-F call (involved uberftp from bw to bw nearline) 8. Contact all BW nearline users, determined what needs to be saved, and ask BW to transfer only needed files to new project nearline – started by BW 9. Call w/ RT on CXM development 10. Call w/ JS on CXM development 11. Forwarded a revised draft of OLCF 25th year highlights to THJ 12. Started UCVM paper revisions


Today:

1. BBP Install – no md5sum on Mac 2. UCVM paper revisions – go to ES? (RT suggest yes) 3. Confirm WS interview on June 26th 4. Caltech datasock request 5. Meeting with HR on workday tools 6. Check on Z2.5 GMPE on CS17.3 7. Review Software metrics from Github 8. CSEP operations and planning – List of ops system fixes 9. Interview planning – coding


Blocked:

  • No

Followups:

  • No

Pending:

  • ABF into CME codebase
  • Check on mis-labeled time series from NK
  • Research ps tech

Related Entries