Difference between revisions of "Product Backlog - Scott"

From SCECpedia
Jump to navigationJump to search
Line 2: Line 2:
  
 
== Project/Product Backlog ==
 
== Project/Product Backlog ==
 +
*Produce computational estimates for Study 18.3
 
*Re-insert data into focal database after upgrade
 
*Re-insert data into focal database after upgrade
 
*Extract SQLite db for Study 17.3
 
*Extract SQLite db for Study 17.3

Revision as of 23:01, 26 February 2018

Scott Callaghan's Project/Product Backlog

Project/Product Backlog

  • Produce computational estimates for Study 18.3
  • Re-insert data into focal database after upgrade
  • Extract SQLite db for Study 17.3
  • Integrate Harvard basin model into NorCal velocity model, resolving any outstanding issues with Science groups.
  • Train Kevin/Phil as alternative CyberShake operators
  • Generate hazard curve using RSQSim ruptures
  • Investigate improved load-balancing for DirectSynth SGT handlers
  • Experiment with OMP parallelization for post-processing
  • Modify CyberShake workflows to use Globus Online for file transfer
  • Create hazard curves for overlapping sites using modified velocity model order
  • Investigate if inconsistent grid point spacing is a result of insufficient precision, or of mixing projections
  • Investigate visualizing velocity meshes in paraview
  • Reduce the runtime of the smoothing code.

Recently Finished Items

  • Calculate hypocenters for ERF 42 (RSQSim) (2/26)
  • Populate database with ERF42 rupture variations and hypocenters (2/26)
  • Create cross-sections from mesh generated with 1) USGS Bay Area; 2) CVM-S4.26.M01; 3) CCA-06; 4) 1D background; with 10 km smoothing (2/22)
  • Create site list for Bay Area study (2/20)

Related Entries