Difference between revisions of "Product Backlog - Phil"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
Philip Maechling's Product Backlog
 
Philip Maechling's Product Backlog
  
== Project/Product Backlog ==
+
== Current Priorities ==
* Schedule CXM Call (Wed 4pm)
+
* Confirm and describe operations of ucvm2mesh, and ucvm2mesh-mpi [[ucvm2mesh]]
* Test UCVMC CS173 test points
+
* Select set of UCVMC CS173 test points, query from UCVMC, and send to Scott
* Ask Andreas about mesh format (prefer 3 files)
 
 
* Check with Scott on UCVMC problems (and fix)
 
* Check with Scott on UCVMC problems (and fix)
 +
* Setup DB call with CK
 +
* Confirm UCVMC issues from SC integrate into UCVMC codes
 +
* Confirm tiling of models (bayarea, cca06, cvm-s4.26, 1d) works properly
 +
* Discuss DataShare letter with SCEC
 +
* develop data management plan for proposal
 +
* confirm with AP density handling (burches law?)
 +
* Develop z1.0 and z2.5 grid file for KM
 +
 +
== Medium Term ==
 +
* Confirm with JB status of PBR db
 
* Prepare ECCS request for CyberShake
 
* Prepare ECCS request for CyberShake
* CSEP Prototype development
+
* Schedule XAB travel
* 11NCEE revision requests mailed out
+
* Kholer CVM integration
 +
* Obtain updated ShakeAlert Accts
  
 
== Related Entries ==
 
== Related Entries ==
 
*[[CME Software Staff]]
 
*[[CME Software Staff]]
 
*[[CME Project]]
 
*[[CME Project]]

Revision as of 16:33, 29 March 2018

Philip Maechling's Product Backlog

Current Priorities

  • Confirm and describe operations of ucvm2mesh, and ucvm2mesh-mpi ucvm2mesh
  • Select set of UCVMC CS173 test points, query from UCVMC, and send to Scott
  • Check with Scott on UCVMC problems (and fix)
  • Setup DB call with CK
  • Confirm UCVMC issues from SC integrate into UCVMC codes
  • Confirm tiling of models (bayarea, cca06, cvm-s4.26, 1d) works properly
  • Discuss DataShare letter with SCEC
  • develop data management plan for proposal
  • confirm with AP density handling (burches law?)
  • Develop z1.0 and z2.5 grid file for KM

Medium Term

  • Confirm with JB status of PBR db
  • Prepare ECCS request for CyberShake
  • Schedule XAB travel
  • Kholer CVM integration
  • Obtain updated ShakeAlert Accts

Related Entries