Difference between revisions of "CSEP Minutes 05-23-2018"
From SCECpedia
Jump to navigationJump to search (Created page with "CSEP Working Group Home Page<br><br> Participants: == Minutes ==") |
|||
Line 2: | Line 2: | ||
Participants: | Participants: | ||
+ | |||
+ | ==Participants== | ||
+ | |||
+ | A. Michael; J. Gilchrist; J. Yu; and M. Werner | ||
== Minutes == | == Minutes == | ||
+ | |||
+ | '''5 year plan topics we missed last week''' | ||
+ | * Notes: CSEP does not use Comcat for authoritative data set | ||
+ | * Idea: run comparison to see how much the catalogs change and its effects on the forecasts | ||
+ | |||
+ | '''CSEP/CISM/Paleoseismology Workshops''' | ||
+ | * CSEP Workshop funded, hoping for the SCEC annual meeting | ||
+ | * 1 day workshop (wrapping up CSEP1 and planning for CSEP2) | ||
+ | * Need to start thinking about what to address; extended abstracts, etc. | ||
+ | * Hope to present CSEP1 curated data set; hoping for California one-day model evaluations. | ||
+ | * W/r/t to the CISM/Paleoseismology | ||
+ | ** Switch to 1 day workshop | ||
+ | ** Proposal to split half time on Paleo side and physics-based forecasting side. | ||
+ | |||
+ | '''Curation of CSEP1 data set''' | ||
+ | * Goal: v1.0 of CSEP1 data set by mid-summer. | ||
+ | * Step 1: Figure out the status of the CSEP system, and make decision based on resources. | ||
+ | * Important to get 'complete' set of results and publish those. | ||
+ | ** Important to publish the evaluation results, next the forecasts, and catalogs. Think about data management problem. | ||
+ | ** ''Proposal from Max:'' Identify missing forecast from one-day model group. Regenerate missing forecasts, and verify the test results and evaluations. Must rebuild trust in the system. | ||
+ | * Task for Bill: Think carefully about levels of reproducibility of CSEP1 data and what time/effort is required. |
Revision as of 20:01, 23 May 2018
Participants:
Participants
A. Michael; J. Gilchrist; J. Yu; and M. Werner
Minutes
5 year plan topics we missed last week
* Notes: CSEP does not use Comcat for authoritative data set * Idea: run comparison to see how much the catalogs change and its effects on the forecasts
CSEP/CISM/Paleoseismology Workshops
* CSEP Workshop funded, hoping for the SCEC annual meeting * 1 day workshop (wrapping up CSEP1 and planning for CSEP2) * Need to start thinking about what to address; extended abstracts, etc. * Hope to present CSEP1 curated data set; hoping for California one-day model evaluations. * W/r/t to the CISM/Paleoseismology ** Switch to 1 day workshop ** Proposal to split half time on Paleo side and physics-based forecasting side.
Curation of CSEP1 data set
- Goal: v1.0 of CSEP1 data set by mid-summer.
- Step 1: Figure out the status of the CSEP system, and make decision based on resources.
- Important to get 'complete' set of results and publish those.
- Important to publish the evaluation results, next the forecasts, and catalogs. Think about data management problem.
- Proposal from Max: Identify missing forecast from one-day model group. Regenerate missing forecasts, and verify the test results and evaluations. Must rebuild trust in the system.
- Task for Bill: Think carefully about levels of reproducibility of CSEP1 data and what time/effort is required.