Difference between revisions of "BBP Release Planning"

From SCECpedia
Jump to navigationJump to search
Line 18: Line 18:
  
 
== Changes Requiring More Time ==
 
== Changes Requiring More Time ==
*All SDSU Changes
+
*SDSU multi-segment changes (with updated GP method)
 +
*UCSB multi-segment changes
 
*Updated Licensing statements in distribution
 
*Updated Licensing statements in distribution
 
*Documentation on individual methods
 
*Documentation on individual methods

Revision as of 18:57, 30 January 2019

Feature list for BBP Release v19.1

  • Updated Irikura 1 (multi-segment, 500m GF)
  • Updated GP (multi-segment, 500m GF)
  • Updated Olsen (multi-segment, 500m GF)
  • Update Seok Goo Song (multi-segment, 500m GF)
  • Updated Exsim (500m GF)
  • New Irikura 2 method (single segment, 500m GF)
  • All methods support site response module
    • Phased out correction coefficients for Part A validation events
  • New Validation events, with observations (Parkfield, San Simeon, Iwata, Chewetsu)
  • GF for Central California
  • Consistent approaches to implementing multi-segment methods.
    • GP and SDSU - multi-seg method 1 (one src file per segment, timing in SRC,timing in SRF file, merge seismograms)
    • SGS, IR1 - multi-seg method 2 (one src file per segment, Rupture generator produces single SRF file, output single set of 3 component seismograms)
  • Added script to calculate number of sims needed for convergence
  • Added calculation of all 3 components RotD100 and RotD50
  • Migrated batch scripts to use Slurm jobs

Changes Requiring More Time

  • SDSU multi-segment changes (with updated GP method)
  • UCSB multi-segment changes
  • Updated Licensing statements in distribution
  • Documentation on individual methods
  • Migration to Python 3

Methods with Changes

  1. Graves Pitarka - Multisegment (approved), 500m (approved)
    1. Pending - nothing
  2. Olsen - Multisegment (approved), 500m (approved)
    1. Pending Review of method and new codes
  3. Seok Goo Song - Multisegment (approved), 500m (in review)
    1. Pending - nothing
  4. Irikura Recipe 1 - Multisegment (under review), 500m GF (approved)
    1. Pending - approval from AP
  5. Irikura Recipe 2 - Single segment (approved), 500m GF (approved)
    1. Pending - nothing
  6. UCSB - Multisegment (under review), 500m (in review)
    1. Pending - Multi-segment codes
  7. Exsim - Single segment (approved), Parameter Changes 500m/s (in review)
    1. Pending - approval from Karin
  8. Anderson - Single segment (in review, no 500m/s
    1. Pending - nothing