Difference between revisions of "High-F Backlog"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 +
== High-F Backlog ==
 +
 
# High-F La Habra Simulations
 
# High-F La Habra Simulations
 
## Rob set-up larger region
 
## Rob set-up larger region
Line 8: Line 10:
 
### Seismogram generation
 
### Seismogram generation
 
### Post-processing
 
### Post-processing
 +
 +
== High-F Tasks ==
 +
 +
=== Science Group ===
 +
 +
* Provide SRC file for La Habra
 +
* Upload new simulations results to hypocenter
 +
 +
=== Fabio ===
 +
 +
* Develop scripts to import simulation time series in new formats (current support for RWG, AWP, Hercules)
 +
** Convert to BBP format
 +
** Rotate, downsample, trim (everything currently done by ts-process)
 +
* Develop script to import simulated data into BBP Platform for post-processing
 +
** Create BBP station list using stations provided in simulated set
 +
** Create simulation ID for new data set and setup new directory structure
 +
*** Update page to record simulation id and matching data set
 +
** Rename simulated data files to match BBP processing pipeline expectations
 +
** Move simulated files into outdata/tmpdata directories
 +
** Run BBP platform starting with the PlotMap module (check with CG if this is needed)
 +
** Publish result to hypocenter

Revision as of 17:59, 28 January 2020

High-F Backlog

  1. High-F La Habra Simulations
    1. Rob set-up larger region
    2. Modelers Agree on source
    3. Run best available high-F at 4hz
    4. Assemble and format High-F results from 3 methods
      1. Write plugin to convert High-F seismograms to BBP post-processing
    5. Run BBP post-processing on High-F results
      1. Seismogram generation
      2. Post-processing

High-F Tasks

Science Group

  • Provide SRC file for La Habra
  • Upload new simulations results to hypocenter

Fabio

  • Develop scripts to import simulation time series in new formats (current support for RWG, AWP, Hercules)
    • Convert to BBP format
    • Rotate, downsample, trim (everything currently done by ts-process)
  • Develop script to import simulated data into BBP Platform for post-processing
    • Create BBP station list using stations provided in simulated set
    • Create simulation ID for new data set and setup new directory structure
      • Update page to record simulation id and matching data set
    • Rename simulated data files to match BBP processing pipeline expectations
    • Move simulated files into outdata/tmpdata directories
    • Run BBP platform starting with the PlotMap module (check with CG if this is needed)
    • Publish result to hypocenter