Difference between revisions of "Staff Priorities - Scott"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
== Current Activities ==
+
== Yesterday ==
#AWP-ODC code migration
+
*Narrowed down RWG 3D issue to input files; ran SMALL site to help with debugging
#Wednesday CyberShake call
+
*Got in trouble on Ranger
#Current production runs
+
*Got rupture geometries from Kevin for F2F ruptures
#Running of Graves SGT at Kraken
+
*Checked
 +
 
 +
== Today ==
 +
*Try Pegasus 4.0.0 with TEST curve
 +
*Run TEST curve with in-mem RV generation on Ranger
 +
*Run post-processing for full CS site with Kraken SGTs
 +
*Email Rob F2F ruptures, ask for thoughts
 +
 
 +
== Blocked ==
 +
*No
 +
 
 +
== Follow-ups ==
 +
*No
  
 
== Areas of Responsibilities ==
 
== Areas of Responsibilities ==

Revision as of 18:03, 21 February 2012

Yesterday

  • Narrowed down RWG 3D issue to input files; ran SMALL site to help with debugging
  • Got in trouble on Ranger
  • Got rupture geometries from Kevin for F2F ruptures
  • Checked

Today

  • Try Pegasus 4.0.0 with TEST curve
  • Run TEST curve with in-mem RV generation on Ranger
  • Run post-processing for full CS site with Kraken SGTs
  • Email Rob F2F ruptures, ask for thoughts

Blocked

  • No

Follow-ups

  • No

Areas of Responsibilities

  • CyberShake 1.4
  • Broadband CyberShake
  • Code migration