Difference between revisions of "Staff Priorities - Fabio"
From SCECpedia
Jump to navigationJump to searchLine 1: | Line 1: | ||
== Yesterday: == | == Yesterday: == | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | * Organize Fling Study information on the wiki, create progress | + | * Organize Fling Study information on the wiki, create progress table |
** Trac #95 (wiki updating) | ** Trac #95 (wiki updating) | ||
* Test HPCC setup with Fling Study scenario 101 and compare result to Phil's run | * Test HPCC setup with Fling Study scenario 101 and compare result to Phil's run | ||
− | * | + | ** Results look good |
+ | * Ran Fling Study scenario 103 (HPCC) | ||
+ | * Met with Phil and John Yu wrt Fling Study strategy | ||
+ | |||
+ | == Today: == | ||
+ | |||
+ | * Validate Fling Study scenario 103 | ||
+ | * Continue executing Fling scenarios | ||
+ | * Meet John Yu to coordinate data storage, scenario running | ||
+ | * Create Fling Data repo on scec-00 or scec-01 | ||
+ | ** Move data from Phil's, John's, and Fabio's directories | ||
* Make trunk work both with and without site response | * Make trunk work both with and without site response | ||
+ | |||
+ | == Blocked: == | ||
+ | * No | ||
+ | |||
+ | == Followups: == | ||
+ | * Meeting with John Yu @ TBD | ||
== Ongoing: == | == Ongoing: == | ||
Line 19: | Line 27: | ||
** First candidate is removing the plot directory from the GF directory | ** First candidate is removing the plot directory from the GF directory | ||
** Create separate validation package | ** Create separate validation package | ||
− | ** Separate events and codebases from each other | + | ** Separate events and codebases from each other |
− | |||
− | |||
− | |||
− | |||
− | |||
− |
Revision as of 17:05, 29 May 2012
Contents
Yesterday:
- Organize Fling Study information on the wiki, create progress table
- Trac #95 (wiki updating)
- Test HPCC setup with Fling Study scenario 101 and compare result to Phil's run
- Results look good
- Ran Fling Study scenario 103 (HPCC)
- Met with Phil and John Yu wrt Fling Study strategy
Today:
- Validate Fling Study scenario 103
- Continue executing Fling scenarios
- Meet John Yu to coordinate data storage, scenario running
- Create Fling Data repo on scec-00 or scec-01
- Move data from Phil's, John's, and Fabio's directories
- Make trunk work both with and without site response
Blocked:
- No
Followups:
- Meeting with John Yu @ TBD
Ongoing:
- Look for ways to break up the GF directory layout, some ideas are:
- First candidate is removing the plot directory from the GF directory
- Create separate validation package
- Separate events and codebases from each other