* Fling Study
 
* Fling Study
** Monitored Scenario 104 execution
+
** Finished running Scenario 104
** Moved data from John's Scenario 107
+
** Ran Scenario 107, compared results against John's run --> OK
 +
** Started Scenario 113
 
** Updated wiki tables
 
** Updated wiki tables
** Fixed permission issue for Ronnie to update Fling station lists
+
* Investigated SDSU's validation run
* Looked at plot directory in GF distribution
+
** BBToolbox and Amp.exe use 2 different set of velocities
 +
** Not able to reproduce Rumi's graph, need to follow up with her
  
 
== Today: ==
 
== Today: ==
Line 12: Line 14:
 
* Fling Study
 
* Fling Study
 
** Continue to schedule Fling scenarios
 
** Continue to schedule Fling scenarios
** Shepherd Fling scenario 104 (75% done, should finish today)
+
** Scenario 113 should finish soon, start 114 and 115.
** Validate John's scenario 107 against mine
+
** Verify John's scenario 108
* Investigate difference between platform run and Rumi's SDSU's run
+
* Follow-up with Rumi wrt her validation run results
* Make trunk work both with and without site response
 
  
 
== Blocked: ==
 
== Blocked: ==
Line 21: Line 22:
  
 
== Followups: ==
 
== Followups: ==
* Talk to Phil about SDSU's validation
 
 
* SDSU's result validation with Rumi
 
* SDSU's result validation with Rumi
  
 
== Ongoing: ==  
 
== Ongoing: ==  
 +
* Make trunk work both with and without site response
 
* Look for ways to break up the GF directory layout, some ideas are:
 
* Look for ways to break up the GF directory layout, some ideas are:
 
** First candidate is removing the plot directory from the GF directory
 
** First candidate is removing the plot directory from the GF directory
 
** Create separate validation package
 
** Create separate validation package
 
** Separate events and codebases from each other
 
** Separate events and codebases from each other

Revision as of 16:47, 1 June 2012

Yesterday:

  • Fling Study
    • Finished running Scenario 104
    • Ran Scenario 107, compared results against John's run --> OK
    • Started Scenario 113
    • Updated wiki tables
  • Investigated SDSU's validation run
    • BBToolbox and Amp.exe use 2 different set of velocities
    • Not able to reproduce Rumi's graph, need to follow up with her

Today:

  • Fling Study
    • Continue to schedule Fling scenarios
    • Scenario 113 should finish soon, start 114 and 115.
    • Verify John's scenario 108
  • Follow-up with Rumi wrt her validation run results

Blocked:

  • No

Followups:

  • SDSU's result validation with Rumi

Ongoing:

  • Make trunk work both with and without site response
  • Look for ways to break up the GF directory layout, some ideas are:
    • First candidate is removing the plot directory from the GF directory
    • Create separate validation package
    • Separate events and codebases from each other