Difference between revisions of "Staff Priorities - Fabio"
From SCECpedia
Jump to navigationJump to searchLine 1: | Line 1: | ||
== Yesterday: == | == Yesterday: == | ||
− | * Trac # | + | * Trac #152: Fixed rupture slip plot |
− | * | + | * Ran all full validations using the updated GP trunk |
− | * | + | ** Most already finished ok, waiting for a few more |
− | * | + | * Broadband development meeting with Phil |
− | * Broadband development | ||
− | |||
== Today: == | == Today: == | ||
− | * | + | * Check all validation results |
+ | * Check in updated code | ||
* Look into LOMAP results from over the weekend (Fabio + Phil) | * Look into LOMAP results from over the weekend (Fabio + Phil) | ||
+ | * Continue sketching BBP workflow (component by component with input and output files) | ||
* Look into HPCC 50-realization LOMAP script | * Look into HPCC 50-realization LOMAP script | ||
* Trac #131: Package new parallel running scripts and check them into svn as part of BBP | * Trac #131: Package new parallel running scripts and check them into svn as part of BBP | ||
− | |||
* Trac #128: Work on Cruise Control setup | * Trac #128: Work on Cruise Control setup | ||
Revision as of 17:09, 7 August 2012
Contents
Yesterday:
- Trac #152: Fixed rupture slip plot
- Ran all full validations using the updated GP trunk
- Most already finished ok, waiting for a few more
- Broadband development meeting with Phil
Today:
- Check all validation results
- Check in updated code
- Look into LOMAP results from over the weekend (Fabio + Phil)
- Continue sketching BBP workflow (component by component with input and output files)
- Look into HPCC 50-realization LOMAP script
- Trac #131: Package new parallel running scripts and check them into svn as part of BBP
- Trac #128: Work on Cruise Control setup
Blocked:
- No
Followups:
- No