Difference between revisions of "Staff Priorities - Scott"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday ==
 
== Yesterday ==
*Submitted SCEC abstract
+
*Checked on UCVM run, continued testing integrated DAX generator, grid issue with SGT jobs, retry
*Found UCVM 11.9 still built on Kraken, passed tests
+
*Tried another PP run, 40x240 - keep finding details to fix and resubmitting
*Got UCVM 12.2 working, somehow, resubmitted test job
+
*Error in specification of emod3d-mpi v1.16.3 run, resumbmitted
*Modified jbsim3d to keep going with memcached errors
+
*Heard back from Kim
*Got PP runs plots from Gideon, looks like zip jobs are taking a long time, added option to separate zip jobs into independent job
 
  
 
== Today ==
 
== Today ==
*Check on UCVM run, continue testing integrated DAX generator
+
*Retry integrated DAX generator SGT jobs
*Try another PP run, 40x240, with separated zip jobs and continuing through memcached errors
+
*Monitor PP run
*Check on test with emod3d-mpi v1.16.3
+
*Queue up runs for Kim
*Get new version of geoproj_subs.c to Phil and Fabio
+
*Try logging into Blue Waters
  
 
== Blocked ==
 
== Blocked ==
*Waiting on Kim to get info on desired runs
+
*No
  
 
== Follow-ups ==
 
== Follow-ups ==

Revision as of 17:16, 14 August 2012

Yesterday

  • Checked on UCVM run, continued testing integrated DAX generator, grid issue with SGT jobs, retry
  • Tried another PP run, 40x240 - keep finding details to fix and resubmitting
  • Error in specification of emod3d-mpi v1.16.3 run, resumbmitted
  • Heard back from Kim

Today

  • Retry integrated DAX generator SGT jobs
  • Monitor PP run
  • Queue up runs for Kim
  • Try logging into Blue Waters

Blocked

  • No

Follow-ups

  • No
  • Runs for Rob and Kim
  • Continue testing compiler optimizations
  • Run some I/O tests to get reference values


Areas of Responsibilities

  • CyberShake 1.4
  • Broadband CyberShake
  • Code migration