Difference between revisions of "Staff Priorities - Fabio"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday: ==
 
== Yesterday: ==
  
* Finished obs_seismograms BBP module
+
* Call with CG to discuss validation experiment pipeline
** Works for both BBP and PEER acceleration files
+
* Reverted to g77 for Rob's HF code (gfortran generates NaN in output)
** Converts observed seismograms into BBP (if needed), then runs Respect
+
* Fix bug in workflow generator that caused only GP GOF module to run
** Uses temp directory inside tmpdir
+
* Ran 4-station LOMAP test (GOOD)
* Changed GP GOF look for observed seismograms in this temp dir
+
* Ran full LOMAP test (GOOD)
* Ran LOMAP 4-stations, and full LOMAP, got good results
+
** SDSU MOGOF takes a long time to run
* Scheduled call with CG to discuss new pipeline
+
** Produces lots of plots
* E-mailed Rumi wrt input and output files for new BBToolbox
 
* Broadband spring planning meeting with Phil
 
  
 
== Today: ==
 
== Today: ==
  
* Modify SDSU GOF module to use files produced by the obs_seismograms module
+
* RP II interview @ 11:30
 +
* Follow up e-mail with CG to clarify use of site response and HP/LP filters while generating GOF
 
* Look into arias plots module
 
* Look into arias plots module
 
* Write script to run LOMAP full validation on HPCC
 
* Write script to run LOMAP full validation on HPCC
Line 21: Line 20:
  
 
== Blocked: ==
 
== Blocked: ==
* scec-01 is down
+
* No
  
 
== Followups: ==
 
== Followups: ==
* No
+
* RP II interview @ 11:30am
 +
* ExSIM call with Phil, Paul, and Karen @ 2:00pm
  
 
== Pending: ==
 
== Pending: ==
 
*  Integrate SDSU code v1.4 into Broadband (after receiving data files)
 
*  Integrate SDSU code v1.4 into Broadband (after receiving data files)

Revision as of 16:54, 16 August 2012

Yesterday:

  • Call with CG to discuss validation experiment pipeline
  • Reverted to g77 for Rob's HF code (gfortran generates NaN in output)
  • Fix bug in workflow generator that caused only GP GOF module to run
  • Ran 4-station LOMAP test (GOOD)
  • Ran full LOMAP test (GOOD)
    • SDSU MOGOF takes a long time to run
    • Produces lots of plots

Today:

  • RP II interview @ 11:30
  • Follow up e-mail with CG to clarify use of site response and HP/LP filters while generating GOF
  • Look into arias plots module
  • Write script to run LOMAP full validation on HPCC
  • Test batching scripts with trunk
  • Trac #131: Package new parallel running scripts and check them into svn as part of BBP
    • Test new package with trunk

Blocked:

  • No

Followups:

  • RP II interview @ 11:30am
  • ExSIM call with Phil, Paul, and Karen @ 2:00pm

Pending:

  • Integrate SDSU code v1.4 into Broadband (after receiving data files)