Difference between revisions of "Staff Priorities - Fabio"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday: ==
 
== Yesterday: ==
  
* Tested the new gen_plots and gp_gof modules
+
* Tested Arias Duration implementation
* Added arias duration plot to the gen_plots module
+
* Ran jbsim with different simulation windows
* Exchanged e-mails with RG about changing the simulation run time
+
** Two parameters involved: ntout and maxnt
* e-mailed RK about scheduling phone call to discuss rerunning some Fling scenarios
+
* Compiled Norm's faster RotD50 code
* Talked to CG about new RotD50 implementation
+
* Call with RK, PM
 +
* Ran LOMAP GP code
  
 
== Today: ==
 
== Today: ==
  
* Test Arias Duration implementation, check code into svn
+
* Test new version of RotD50 code
* Try running jbsim with different simulation windows
+
** LOMAP GP and UCSB
* Integrate faster RotD50 code
 
* Call with RK, PM
 
 
* Work on BBToolbox integration
 
* Work on BBToolbox integration
 +
* Broadband science call
  
 
== Blocked: ==
 
== Blocked: ==
Line 19: Line 19:
  
 
== Followups: ==
 
== Followups: ==
* Cybershake call @ 11am
+
* Broadband science call @ 1pm
* RK, PM call @ 1:30pm
 

Revision as of 17:04, 20 September 2012

Yesterday:

  • Tested Arias Duration implementation
  • Ran jbsim with different simulation windows
    • Two parameters involved: ntout and maxnt
  • Compiled Norm's faster RotD50 code
  • Call with RK, PM
  • Ran LOMAP GP code

Today:

  • Test new version of RotD50 code
    • LOMAP GP and UCSB
  • Work on BBToolbox integration
  • Broadband science call

Blocked:

  • No

Followups:

  • Broadband science call @ 1pm