Difference between revisions of "Staff Priorities - Masha"

From SCECpedia
Jump to navigationJump to search
Line 2: Line 2:
  
 
=== Yesterday ===
 
=== Yesterday ===
 
* CSEP status meeting at 9am, posted minutes
 
 
* Danijel missed the status meeting, called to catch up
 
** Danijel sent out suggestion to drop STEP Matlab
 
** Add RELM Mainshock models to USGS forecasts evaluation
 
** Retrospective testing of USGS forecasts: 5-year and 7-year period since 2006/01/01
 
 
* csep-op:
 
** Catching up with CA one-day forecasts
 
** ANSS catalog was not available through FTP, contacted ANSS
 
 
* Trac ticket #302 Develop interactive results viewer application
 
** Met with John to set up VM image with generic CSEP installation
 
  
 
* Trac ticket #305 Polygon's vertex and side inclusion flags should be used to identify forecast's polygon a target event belongs to:
 
* Trac ticket #305 Polygon's vertex and side inclusion flags should be used to identify forecast's polygon a target event belongs to:
** Acceptance test is failing on csep-cert
+
** Debugging of failed acceptance tests on csep-cert, asked John to install newer version of shapely
  
 
* Trac ticket #249 Diagnostics tests should support empty observation catalog
 
* Trac ticket #249 Diagnostics tests should support empty observation catalog
** Acceptance test fail with newer R codes by Robert
+
** Changing CSEP codes to work with newer R codes by Robert
  
* Met with John:
+
=== Today ===
 +
==== CSEP ====
 +
 +
* Contacted John:
 
** Network cable problems
 
** Network cable problems
 
** csep-op hardware upgrade
 
** csep-op hardware upgrade
  
=== Today ===
+
* NZTC:
==== CSEP ====
+
** Set up configuration files to generate hybrid forecasts
 
  
 
* csep-op:  
 
* csep-op:  
** Re-processing due to expired Matlab licence
+
** Waiting for current processing to finish to catch up with missed processing
 
 
* Trac ticket #305 Polygon's vertex and side inclusion flags should be used to identify forecast's polygon a target event belongs to:
 
** Acceptance test is failing on csep-cert
 
  
 +
* Trac ticket #305 Polygon's vertex and side inclusion flags should be used to identify forecast's polygon a target event belongs to
 
* Trac ticket #249 Diagnostics tests should support empty observation catalog
 
* Trac ticket #249 Diagnostics tests should support empty observation catalog
** Acceptance test fail with newer R codes by Robert
 
  
 
* Open Trac tickets:   
 
* Open Trac tickets:   
 
** 303 Process Global experiments for 2012/12: 8-17 due to network issues on csep-op server
 
** 303 Process Global experiments for 2012/12: 8-17 due to network issues on csep-op server
 
** 295 Diagnostics tests should be applied to time-dependent forecasts
 
** 295 Diagnostics tests should be applied to time-dependent forecasts
 +
** 302 Develop interactive results viewer application:
 +
*** Waiting for current processing to finish to enable VM
  
 
'''Blocked''': None
 
'''Blocked''': None

Revision as of 18:03, 7 February 2013

Current Activities

Yesterday

  • Trac ticket #305 Polygon's vertex and side inclusion flags should be used to identify forecast's polygon a target event belongs to:
    • Debugging of failed acceptance tests on csep-cert, asked John to install newer version of shapely
  • Trac ticket #249 Diagnostics tests should support empty observation catalog
    • Changing CSEP codes to work with newer R codes by Robert

Today

CSEP

  • Contacted John:
    • Network cable problems
    • csep-op hardware upgrade
  • NZTC:
    • Set up configuration files to generate hybrid forecasts
  • csep-op:
    • Waiting for current processing to finish to catch up with missed processing
  • Trac ticket #305 Polygon's vertex and side inclusion flags should be used to identify forecast's polygon a target event belongs to
  • Trac ticket #249 Diagnostics tests should support empty observation catalog
  • Open Trac tickets:
    • 303 Process Global experiments for 2012/12: 8-17 due to network issues on csep-op server
    • 295 Diagnostics tests should be applied to time-dependent forecasts
    • 302 Develop interactive results viewer application:
      • Waiting for current processing to finish to enable VM

Blocked: None

Followups: None

Responsiblities