Difference between revisions of "Staff Priorities - Scott"

From SCECpedia
Jump to navigationJump to search
Line 26: Line 26:
 
*Produce site list + KML for CS Study 2.3
 
*Produce site list + KML for CS Study 2.3
 
*UCERF3 meeting
 
*UCERF3 meeting
 +
*Reply re: Stampede space
  
 
== Blocked ==
 
== Blocked ==

Revision as of 18:12, 21 February 2013

Yesterday

  • Blue Waters:
    • Tested post-AWP helper scripts, found bugs, retesting
    • Worked on workflow generation script
    • Validated RWG TEST V3.0.3 SGTs
  • Stampede:
    • Tested PP again with TEST, validated
  • Kraken:
    • Ran post-processing with RWG TEST V3.0.3 SGTs, validated
  • CyberShake calls - updated computational plan
  • Worked with David on setting up remaining runs

Today

  • Blue Waters:
    • Commit AWP helper scripts to SVN
    • Continue testing post-AWP helper scripts
    • Validate AWP WNGC SGTs on Kraken
  • Stampede:
    • Run s351 PP with timing numbers to get performance comparison with Kraken
    • Install and test AWP helper scripts
    • Test AWP SGT generation
  • Kraken:
    • Validate AWP WNGC SGTs
    • Select a rupture for forward simulation
  • Add AWP helper scripts to AWP workflow
  • Produce site list + KML for CS Study 2.3
  • UCERF3 meeting
  • Reply re: Stampede space

Blocked

  • No

Follow-ups

  • No

Areas of Responsibilities

  • CyberShake 1.4
  • Broadband CyberShake
  • Code migration