Difference between revisions of "Staff Priorities - Fabio"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday: ==
 
== Yesterday: ==
  
* Updated some trac tickets
+
* Refined workflow generator
* ExSim
+
** Still runs pre-SWUS BBP validation events
** Set up LABasin region to run ExSIM simulations
+
** plot_map works now in all cases
** Generated plots for Northridge and Whittier Narrows
+
* Modified cluster script to use new BBP workflow
** Sent results to KA and CG
+
** Ran ExSIM on hypocenter cluster
** Could not find any real problems in KA's runs
+
* Broadband Science call
** LOMAP: 10m, Northridge: 5m, Whittier Narrows: 2m
+
** Showed new plots
* Tested workflow generator
+
* Received TACC account e-mail
* Updated gmpe comparison scripts to work with ExSIM
 
* Completed Tottori 120s and 200s runs
 
** Basically take the same time
 
  
 
== Today: ==
 
== Today: ==
  
* Send e-mail to RG about simulation time
+
* Follow-up with TACC account
* Continue testing workflow generator
+
* Wrap up workflow generator modifications
* Trim acceptance tests
+
** Fix BBToolbox unit test
** from 99 --> about 10
+
** Revise acceptance test cases
* Modify cluster scripts to match updated workflow generator
+
** Create updated version, send it to KA, and PM
  
 
== Blocked: ==
 
== Blocked: ==

Revision as of 17:09, 11 March 2013

Yesterday:

  • Refined workflow generator
    • Still runs pre-SWUS BBP validation events
    • plot_map works now in all cases
  • Modified cluster script to use new BBP workflow
    • Ran ExSIM on hypocenter cluster
  • Broadband Science call
    • Showed new plots
  • Received TACC account e-mail

Today:

  • Follow-up with TACC account
  • Wrap up workflow generator modifications
    • Fix BBToolbox unit test
    • Revise acceptance test cases
    • Create updated version, send it to KA, and PM

Blocked:

  • No

Followups:

  • No