Difference between revisions of "Staff Priorities - Phil"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday: ==
 
== Yesterday: ==
* Sent NICS write-up on CS
+
* CSEP call
* Responded to NSF writer with image permissions
+
* CyberShake call
* Develop Geoinformatics schedule of topics for calls
+
* Meeting with TG
* UCVM design review
+
* Talk with Nolan on metadata
 +
* Meeting with YG
 +
* Talk with DG on amps calc and UCVM changes
 +
* Talk with Fabio on bband
  
 
== Today: ==
 
== Today: ==
* Contact Carl Tape about CVM Meeting in July
+
* Try cvmsi tests
* SEISM engineering 12noon-1pm
+
* SEISM Call 11am
* Touch-base 1pm
+
* Yellowstone Call 12noon
* Meeting YG 2pm
+
* Try BBP March 12 release
* XSEDE Paper
+
* Call with NICS proposal
 +
* Prepare for
  
 
== Blocked: ==
 
== Blocked: ==
Line 16: Line 20:
  
 
== Followups: ==  
 
== Followups: ==  
* No
+
* UCVM Datum issue with DG
  
 
== Pending: ==
 
== Pending: ==
* Try BBP March 12 release
 
 
* Complete adding new users to all systems
 
* Complete adding new users to all systems
 
* UCERF3.0 on Stampede plans
 
* UCERF3.0 on Stampede plans

Revision as of 17:20, 14 March 2013

Yesterday:

  • CSEP call
  • CyberShake call
  • Meeting with TG
  • Talk with Nolan on metadata
  • Meeting with YG
  • Talk with DG on amps calc and UCVM changes
  • Talk with Fabio on bband

Today:

  • Try cvmsi tests
  • SEISM Call 11am
  • Yellowstone Call 12noon
  • Try BBP March 12 release
  • Call with NICS proposal
  • Prepare for

Blocked:

  • No

Followups:

  • UCVM Datum issue with DG

Pending:

  • Complete adding new users to all systems
  • UCERF3.0 on Stampede plans
  • Ask when UCERF3 will be ready for CSEP
  • Discuss Arias Duration on bbp
  • Review the CVM evaluation differences between CVM-H 11.9.1 and CVM-H 11.9.0