Difference between revisions of "Staff Priorities - Masha"

From SCECpedia
Jump to navigationJump to search
Line 3: Line 3:
 
=== Yesterday ===
 
=== Yesterday ===
  
* Processing of Md2 long-term forecast groups is running, would run for 2 more weeks based on last month processing, killed the process
+
* John rebooted intensity with VM enabled, created csep-cherrypy image for results viewer:
 +
** Tried to run Python script, missing CherryPy installation
 +
** John installed CherryPy, will enable port forwarding
  
* Sent email to Max regarding results discrepancy evaluating CA 3-month forecasts: CSEP is computing true logL per observed event, should be per magnitude bin
+
* John is copying csep-op data to new server; it's at very slow rate, estimate is to finish in 10-12 days
  
* John rebooted intensity with VM enabled, created csep-cherrypy image for results viewer:
+
* Request from Danijel and Max to evaluate USGS vs RELM forecasts for 1967-2007 testing period, started on csep-cert
** Tried to run Python script, missing CherryPy installation
+
 
** John will enable port forwarding
+
* Asked John for input on summary of testing center distribution (request from Phil)
** Can use CSEP modules from CherryPy script to navigate published file system on my laptop
 
  
 
=== Today ===
 
=== Today ===
 
==== CSEP ====
 
==== CSEP ====
  
* CSEP status meeting at 9am
+
* Had a follow up with John on csep-op data transfer:
** Post meeting minutes
+
** John to investigate faster USB options for data transfer
 +
** Might restore present csep-op server to continue operations if have to continue data transfer to the new server at the same slow rate
  
* Asked John to switch the server once nightly processing completes (around noon)
+
* NZTC: Set up forecasts groups and configuration files to evaluate one-year forecasts for Canterbury special study
** Install official V13.4.0 release
+
** Asked Matt which catalog to use for evaluation based on Matt's email regarding new Darfield CSEP experiment (GeoNet catalog availability)
 +
** David and Matt asked to regenerate one-year forecasts with start date post December, 2007, with updated input catalog
  
* NZTC: Set up configuration files to evaluate one-year forecasts for Canterbury special study
+
* Summary of testing center distribution (request from Phil)
  
 
* Pending data requests:
 
* Pending data requests:
 
** By David Rhoades (retrospective 20 years of 3-month alarm-based forecasts)
 
** By David Rhoades (retrospective 20 years of 3-month alarm-based forecasts)
 
** By Alvaro Gonzalez: to process missed one-day forecasts and latest results
 
** By Alvaro Gonzalez: to process missed one-day forecasts and latest results
** By Max Schneider: retrospective evaluation of USGS forecasts since 1960
 
  
 
=== TODO ===
 
=== TODO ===
Line 34: Line 36:
 
'''Blocked''': None
 
'''Blocked''': None
  
'''Followups''': With John on new csep-op server upgrade
+
'''Followups''': None
  
 
== Responsiblities ==
 
== Responsiblities ==

Revision as of 17:30, 12 April 2013

Current Activities

Yesterday

  • John rebooted intensity with VM enabled, created csep-cherrypy image for results viewer:
    • Tried to run Python script, missing CherryPy installation
    • John installed CherryPy, will enable port forwarding
  • John is copying csep-op data to new server; it's at very slow rate, estimate is to finish in 10-12 days
  • Request from Danijel and Max to evaluate USGS vs RELM forecasts for 1967-2007 testing period, started on csep-cert
  • Asked John for input on summary of testing center distribution (request from Phil)

Today

CSEP

  • Had a follow up with John on csep-op data transfer:
    • John to investigate faster USB options for data transfer
    • Might restore present csep-op server to continue operations if have to continue data transfer to the new server at the same slow rate
  • NZTC: Set up forecasts groups and configuration files to evaluate one-year forecasts for Canterbury special study
    • Asked Matt which catalog to use for evaluation based on Matt's email regarding new Darfield CSEP experiment (GeoNet catalog availability)
    • David and Matt asked to regenerate one-year forecasts with start date post December, 2007, with updated input catalog
  • Summary of testing center distribution (request from Phil)
  • Pending data requests:
    • By David Rhoades (retrospective 20 years of 3-month alarm-based forecasts)
    • By Alvaro Gonzalez: to process missed one-day forecasts and latest results

TODO

  • For next week (4/15): summary of testing center distribution, how to add new evaluation tests to EEW testing framework

Blocked: None

Followups: None

Responsiblities