Difference between revisions of "Staff Priorities - Phil"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday: ==
 
== Yesterday: ==
* GPU Telecon
+
* Repair and restore files to Mac Laptop
* SEISM Telecon
+
* BBP Call with PS and CG
* Contact NCAR
+
* GPU call with YC and Titan group
* Contact BW
 
* Contact CS scientists
 
  
 
== Today: ==
 
== Today: ==
* Update BBP processing estimates
+
* CSEP Telecon
* Confirm call with DM
+
*  
* Call LH
+
 
* Call CT
 
* BBP Call 2pm
 
* Blue Waters call 12pm
 
* Add users BW
 
* Finalize XAB travel
 
* CSEP External forecast review
 
* Laptop issues
 
  
 
== Blocked: ==
 
== Blocked: ==
Line 25: Line 16:
  
 
== Pending: ==
 
== Pending: ==
* Ask when UCERF3 will be ready for CSEP
 
* Review the CVM evaluation differences between CVM-H 11.9.1 and CVM-H 11.9.0
 
 
* CVM Evaluation system differences
 
* CVM Evaluation system differences
 
* SRC files posted for SGS
 
* SRC files posted for SGS

Revision as of 17:03, 17 April 2013

Yesterday:

  • Repair and restore files to Mac Laptop
  • BBP Call with PS and CG
  • GPU call with YC and Titan group

Today:

  • CSEP Telecon


Blocked:

  • No

Followups:

  • No

Pending:

  • CVM Evaluation system differences
  • SRC files posted for SGS