*Blue Waters
 
*Blue Waters
**Reformatted GPU SGTs for calculating hazard curve
+
**Continued work on coscheduling
*Stampede
+
**Tested SeisPSA code - validated
**Calculated GPU hazard curve - matches almost exactly!
+
*Emailed GPU hazard curve results out
*Started zipping 2011-12 CyberShake runs
+
*Debugged various production run issues
  
 
== Today ==
 
== Today ==
 
*Blue Waters
 
*Blue Waters
**Back to work on coscheduling
+
**Test ExtractSGT code
**Get site list for Study 13.4, start the run
+
**Test coscheduling
*Email GPU hazard curve results out
+
*Monitor production runs
*Monitor zipping
+
*Monitor 2011-12 zipping, delete once files are tgz-ed
*Modify stage-out location to scec-04
 
  
 
== Blocked ==
 
== Blocked ==
Line 18: Line 17:
  
 
== Follow-ups ==  
 
== Follow-ups ==  
*GB call?
+
*With David
*CyberShake technical call
 
  
  

Revision as of 19:07, 22 April 2013

Yesterday

  • Blue Waters
    • Continued work on coscheduling
    • Tested SeisPSA code - validated
  • Emailed GPU hazard curve results out
  • Debugged various production run issues

Today

  • Blue Waters
    • Test ExtractSGT code
    • Test coscheduling
  • Monitor production runs
  • Monitor 2011-12 zipping, delete once files are tgz-ed

Blocked

  • No

Follow-ups

  • With David


Check on SA forward sim Email Stampede staff, let them know about node crashing solution Finish wiki entries for Stampede and Blue Waters validation

Areas of Responsibilities

  • CyberShake 1.4
  • Broadband CyberShake