Difference between revisions of "Staff Priorities - Phil"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday: ==
 
== Yesterday: ==
* Repair and restore files to Mac Laptop
 
 
* BBP Call with PS and CG
 
* BBP Call with PS and CG
* GPU call with YC and Titan group
+
* GPU paper turned in
  
 
== Today: ==
 
== Today: ==
* CSEP Telecon
+
* Finalize CME meeting
 +
* Talk about workflows for BBP with Fabio
 
*  
 
*  
  

Revision as of 16:40, 29 April 2013

Yesterday:

  • BBP Call with PS and CG
  • GPU paper turned in

Today:

  • Finalize CME meeting
  • Talk about workflows for BBP with Fabio


Blocked:

  • No

Followups:

  • No

Pending:

  • CVM Evaluation system differences
  • SRC files posted for SGS