Difference between revisions of "Staff Priorities - Phil"
From SCECpedia
Jump to navigationJump to searchLine 12: | Line 12: | ||
* Update SEISM Metrics | * Update SEISM Metrics | ||
* NCAR data sharing plans | * NCAR data sharing plans | ||
− | + | * SRC files posted for SGS | |
== Blocked: == | == Blocked: == | ||
Line 22: | Line 22: | ||
== Pending: == | == Pending: == | ||
* CVM Evaluation system differences | * CVM Evaluation system differences | ||
− |
Revision as of 16:45, 29 April 2013
Contents
Yesterday:
- BBP Call with PS and CG
- GPU paper turned in
Today:
- Finalize CME meeting
- Finalize Fairbanks meeting
- Talk about workflows for BBP with Fabio
- Prepare Q1 ShakeAlert report
- Follow-up with GB Paper
- Ergo check
- Update SEISM Metrics
- NCAR data sharing plans
- SRC files posted for SGS
Blocked:
- No
Followups:
- No
Pending:
- CVM Evaluation system differences