Difference between revisions of "Staff Priorities - Masha"
From SCECpedia
Jump to navigationJump to searchLine 3: | Line 3: | ||
=== Yesterday === | === Yesterday === | ||
− | * | + | * TD: new model submission from MIT |
+ | ** John created TD development image, Ji installed and compiled the codes on the image | ||
* csep-op server: | * csep-op server: | ||
− | ** | + | ** Discrepancy in logL results for EEPAS-0S_Combined forecast as reported by Max Schneider |
− | ** | + | *** Don't see reported -73 vs. -76 values, only 0.1% difference in logL results |
− | + | *** Differences are due to the scale factor for the last test date being 0.989999 | |
− | * | ||
* CSEP Trac tickets: | * CSEP Trac tickets: | ||
− | ** #310 Move the model names from the right-hand-side to the left-hand side of the plot figure for T and W tests | + | ** DONE: #310 Move the model names from the right-hand-side to the left-hand side of the plot figure for T and W tests |
** #311 Add support for different evaluation tests schedules within the same forecast group | ** #311 Add support for different evaluation tests schedules within the same forecast group | ||
** #312 Add support for 30-minutes forecasts | ** #312 Add support for 30-minutes forecasts | ||
Line 19: | Line 19: | ||
==== CSEP ==== | ==== CSEP ==== | ||
− | * | + | * John asked if Matlab R2007a can be retired |
− | ** | + | ** TD testing center is using the license, asked John to install latest Matlab within TD image to run acceptance test for Rowena's model |
− | + | csep-op: | |
** Re-processing to catch up with evaluation during 2 weeks of down time | ** Re-processing to catch up with evaluation during 2 weeks of down time | ||
+ | ** Data request from Alvaro Gonzalez: to process missed one-day forecasts and latest results | ||
* CSEP Trac tickets: | * CSEP Trac tickets: | ||
− | ** | + | ** Working on: #311 Add support for different evaluation tests schedules within the same forecast group |
− | |||
** #312 Add support for 30-minutes forecasts | ** #312 Add support for 30-minutes forecasts | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
=== TODO === | === TODO === | ||
Line 40: | Line 34: | ||
'''Blocked''': None | '''Blocked''': None | ||
− | '''Followups''': | + | '''Followups''': with Phil on CSEP, TD, and EEW priorities |
== Responsiblities == | == Responsiblities == |
Revision as of 18:50, 22 May 2013
Current Activities
Yesterday
- TD: new model submission from MIT
- John created TD development image, Ji installed and compiled the codes on the image
- csep-op server:
- Discrepancy in logL results for EEPAS-0S_Combined forecast as reported by Max Schneider
- Don't see reported -73 vs. -76 values, only 0.1% difference in logL results
- Differences are due to the scale factor for the last test date being 0.989999
- Discrepancy in logL results for EEPAS-0S_Combined forecast as reported by Max Schneider
- CSEP Trac tickets:
- DONE: #310 Move the model names from the right-hand-side to the left-hand side of the plot figure for T and W tests
- #311 Add support for different evaluation tests schedules within the same forecast group
- #312 Add support for 30-minutes forecasts
Today
CSEP
- John asked if Matlab R2007a can be retired
- TD testing center is using the license, asked John to install latest Matlab within TD image to run acceptance test for Rowena's model
csep-op:
- Re-processing to catch up with evaluation during 2 weeks of down time
- Data request from Alvaro Gonzalez: to process missed one-day forecasts and latest results
- CSEP Trac tickets:
- Working on: #311 Add support for different evaluation tests schedules within the same forecast group
- #312 Add support for 30-minutes forecasts
TODO
Blocked: None
Followups: with Phil on CSEP, TD, and EEW priorities