Difference between revisions of "Staff Priorities - Masha"

From SCECpedia
Jump to navigationJump to search
Line 2: Line 2:
  
 
=== Yesterday ===
 
=== Yesterday ===
 
* TD: new model submission from MIT
 
** John created TD development image, Ji installed and compiled the codes on the image
 
  
 
* csep-op server:
 
* csep-op server:
** Discrepancy in logL results for EEPAS-0S_Combined forecast as reported by Max Schneider
+
** Data request from Alvaro Gonzalez: to process missed one-day forecasts and latest results for all testing regions within SCEC testing center
*** Don't see reported -73 vs. -76 values, only 0.1% difference in logL results
 
*** Differences are due to the scale factor for the last test date being 0.989999
 
** Finished archival of raw ANSS catalog data into SVN
 
  
 
* CSEP Trac tickets:
 
* CSEP Trac tickets:
** DONE: #310 Move the model names from the right-hand-side to the left-hand side of the plot figure for T and W tests
 
 
** #311 Add support for different evaluation tests schedules within the same forecast group
 
** #311 Add support for different evaluation tests schedules within the same forecast group
** #312 Add support for 30-minutes forecasts
 
  
 
=== Today ===
 
=== Today ===
 
==== CSEP ====
 
==== CSEP ====
  
* John asked if Matlab R2007a can be retired
+
* TD:
** TD testing center is using the license, asked John to install latest Matlab within TD image to run acceptance test for Rowena's model
+
** Rowena sent updated file to read new format of PBO GPS data
  
csep-op:
+
* CSEP:
 +
** Status meeting at 10am, post meeting minutes
 +
 
 +
* csep-op:
 
** Re-processing to catch up with evaluation during 2 weeks of down time
 
** Re-processing to catch up with evaluation during 2 weeks of down time
** Data request from Alvaro Gonzalez: to process missed one-day forecasts and latest results
 
  
 
* CSEP Trac tickets:
 
* CSEP Trac tickets:
 
** Working on: #311 Add support for different evaluation tests schedules within the same forecast group
 
** Working on: #311 Add support for different evaluation tests schedules within the same forecast group
** #312 Add support for 30-minutes forecasts
 
  
 
=== TODO ===
 
=== TODO ===
 +
 +
* TD: new model submission from MIT
 +
* CSEP:
 +
** Trac ticket #312: Add support for 30-minutes forecasts
 +
** M8 installation
  
 
'''Blocked''': None
 
'''Blocked''': None
  
'''Followups''': with Phil on CSEP, TD, and EEW priorities
+
'''Followups''': None
  
 
== Responsiblities ==
 
== Responsiblities ==

Revision as of 18:00, 29 May 2013

Current Activities

Yesterday

  • csep-op server:
    • Data request from Alvaro Gonzalez: to process missed one-day forecasts and latest results for all testing regions within SCEC testing center
  • CSEP Trac tickets:
    • #311 Add support for different evaluation tests schedules within the same forecast group

Today

CSEP

  • TD:
    • Rowena sent updated file to read new format of PBO GPS data
  • CSEP:
    • Status meeting at 10am, post meeting minutes
  • csep-op:
    •  Re-processing to catch up with evaluation during 2 weeks of down time
  • CSEP Trac tickets:
    • Working on: #311 Add support for different evaluation tests schedules within the same forecast group

TODO

  • TD: new model submission from MIT
  • CSEP:
    • Trac ticket #312: Add support for 30-minutes forecasts
    • M8 installation

Blocked: None

Followups: None

Responsiblities