Difference between revisions of "Staff Priorities - Masha"

From SCECpedia
Jump to navigationJump to search
Line 3: Line 3:
 
=== Yesterday ===
 
=== Yesterday ===
  
* TD: Updated TPO model to generate lower resolution images on operational image
+
* EEW:
 +
** Added magnitude histogram for False Alerts to new evaluation test, ran evaluation for 2013/01-2013/06 on certification image
  
* CSEP status meeting at noon, sent out announcement for the next meeting for August 7, noon
+
=== Today ===
  
* EEW:
+
* CSEP abstract for the AGU meeting
** Ran new "FalseAlert" evaluation test on copy of operational data (2011/9/1-2013/7/22) on certification image:
 
*** File problems for restored data (from last EEW disk failure: archived catalog files are directories or copy of metadata files)
 
*** "KeyError" type of failure (for example, "KeyError: 'NC 71646396 -124.33283 40.29100 2011 09 14 2.00 20.6200 05 47 57.2900'" for test date of 2011/09/14)
 
*** Ran out of disk space processing 2013/04/15
 
  
=== Today ===
+
* CSEP: follow up on M8 installation within CSEP with Jeremy
  
 
* EEW:
 
* EEW:
** Ask John to allocate more disk space for the home directory on certification image
+
** Per Phil's feedback, change magnitude plot for FalseAlerts to stacked up bars to separate "cancelled" and "not cancelled" events
** Handle errors
 
** Send Phil existing summary for "FalseAlert" test from certification image
 
  
* CSEP:
+
* TD: check on Dispatcher logs to confirm no change in GPS data per Ji's request
** Post meeting minutes
 
** Continue on Trac ticket #312: "Add support for 30-minutes forecasts" if there is time left after EEW
 
  
 
=== TODO ===
 
=== TODO ===

Revision as of 17:22, 5 August 2013

Current Activities

Yesterday

  • EEW:
    • Added magnitude histogram for False Alerts to new evaluation test, ran evaluation for 2013/01-2013/06 on certification image

Today

  • CSEP abstract for the AGU meeting
  • CSEP: follow up on M8 installation within CSEP with Jeremy
  • EEW:
    • Per Phil's feedback, change magnitude plot for FalseAlerts to stacked up bars to separate "cancelled" and "not cancelled" events
  • TD: check on Dispatcher logs to confirm no change in GPS data per Ji's request

TODO

  • CSEP:
    • M8 installation

Blocked: None

Followups: with Jeremy on M8 installation progress

Responsiblities