Difference between revisions of "Staff Priorities - Phil"

From SCECpedia
Jump to navigationJump to search
Line 4: Line 4:
  
 
== Today: ==
 
== Today: ==
* HPCC talk on bhp
+
* Ask SC to propose BW metrics from paper
* BBP iteration plan
 
* Call with RWG 1:30pm
 
* BBP Call
 
  
 
== Blocked: ==
 
== Blocked: ==

Revision as of 06:40, 25 November 2013

Yesterday:

  • BW Call
  • Travel plans to AGU

Today:

  • Ask SC to propose BW metrics from paper

Blocked:

  • No

Followups:

Pending:

  • Formalize the simulation plans for NR
  • Call with SD and KO on dynamic rupture
  • Find images from CMU of circular GTL structures
  • Security Discussion with SC
  • Backup strategy with group
  • Setup license meeting with Stevens USC
  • Create Storage Map for SCEC Storage (SC)
  • Updated BBP and UCVM required docs to include "known problems" file