Difference between revisions of "Staff Priorities - Phil"
From SCECpedia
Jump to navigationJump to search (→Today:) |
|||
Line 1: | Line 1: | ||
== Yesterday: == | == Yesterday: == | ||
− | * | + | * NCAR Report to TJ YC |
− | * | + | * Posted SC materials on wiki |
+ | * Collected IDC report from SC13 | ||
+ | * Ergo eval | ||
+ | * UCVM Paper review | ||
+ | * OLCF follow-up | ||
== Today: == | == Today: == | ||
− | * | + | * Setup High-F call for Wed |
− | + | * High-F call 11:30am | |
+ | * YC Call 2pm | ||
+ | * SC to propose BW metrics from paper | ||
* Setup INCITE Startup Request Call | * Setup INCITE Startup Request Call | ||
Line 15: | Line 21: | ||
== Pending: == | == Pending: == | ||
− | *THJ and YC Call | + | * THJ and YC Call |
* NGA-E Plan link to THJ | * NGA-E Plan link to THJ | ||
* FW ABF into CME codebase | * FW ABF into CME codebase |
Revision as of 18:24, 26 November 2013
Contents
Yesterday:
- NCAR Report to TJ YC
- Posted SC materials on wiki
- Collected IDC report from SC13
- Ergo eval
- UCVM Paper review
- OLCF follow-up
Today:
- Setup High-F call for Wed
- High-F call 11:30am
- YC Call 2pm
- SC to propose BW metrics from paper
- Setup INCITE Startup Request Call
Blocked:
- No
Followups:
- No
Pending:
- THJ and YC Call
- NGA-E Plan link to THJ
- FW ABF into CME codebase
- Formalize the simulation plans for NR
- Call with SD and KO on dynamic rupture
- Find images from CMU of circular GTL structures
- Security Discussion with SC
- Backup strategy with group
- Setup license meeting with Stevens USC
- Create Storage Map for SCEC Storage (SC)
- Updated BBP and UCVM required docs to include "known problems" file