Difference between revisions of "Staff Priorities - Phil"
From SCECpedia
Jump to navigationJump to searchLine 1: | Line 1: | ||
== Yesterday: == | == Yesterday: == | ||
− | * | + | * Peace on Earth |
− | |||
== Today: == | == Today: == | ||
− | * | + | * DOE 2013 Final Report |
− | * | + | * SCEC EarthCube participation |
− | * | + | * Chair Palace |
+ | * | ||
== Blocked: == | == Blocked: == | ||
Line 12: | Line 12: | ||
== Followups: == | == Followups: == | ||
− | * UCVM | + | * UCVM meeting () |
+ | * BBP Meeting () | ||
+ | * CSEP Meeting () | ||
+ | * CyberShake Meeting () | ||
+ | * UCERF Meeting () | ||
+ | * High-F Update | ||
== Pending: == | == Pending: == | ||
* THJ and YC Call | * THJ and YC Call | ||
− | |||
* FW ABF into CME codebase | * FW ABF into CME codebase | ||
* Formalize the simulation plans for NR | * Formalize the simulation plans for NR | ||
− | |||
* Find images from CMU of circular GTL structures | * Find images from CMU of circular GTL structures | ||
* Security Discussion with SC | * Security Discussion with SC |
Revision as of 17:38, 6 January 2014
Contents
Yesterday:
- Peace on Earth
Today:
- DOE 2013 Final Report
- SCEC EarthCube participation
- Chair Palace
Blocked:
- No
Followups:
- UCVM meeting ()
- BBP Meeting ()
- CSEP Meeting ()
- CyberShake Meeting ()
- UCERF Meeting ()
- High-F Update
Pending:
- THJ and YC Call
- FW ABF into CME codebase
- Formalize the simulation plans for NR
- Find images from CMU of circular GTL structures
- Security Discussion with SC
- Backup strategy with group
- Setup license meeting with Stevens USC
- Create Storage Map for SCEC Storage (SC)
- Updated BBP and UCVM required docs to include "known problems" file