Difference between revisions of "Staff Priorities - Phil"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday: ==
 
== Yesterday: ==
* Review AGU Posters BBP, CSEP, UCVM
+
* Peace on Earth
* Make AGU Poster EEW
 
  
 
== Today: ==
 
== Today: ==
* Circulate INCITE Machine User Lists
+
* DOE 2013 Final Report
* BBP Call (2pm)
+
* SCEC EarthCube participation
* BBP Storage Review
+
* Chair Palace
 +
*
  
 
== Blocked: ==
 
== Blocked: ==
Line 12: Line 12:
  
 
== Followups: ==  
 
== Followups: ==  
* UCVM Release planning review
+
* UCVM meeting ()
 +
* BBP Meeting ()
 +
* CSEP Meeting ()
 +
* CyberShake Meeting ()
 +
* UCERF Meeting ()
 +
* High-F Update
  
 
== Pending: ==
 
== Pending: ==
 
* THJ and YC Call
 
* THJ and YC Call
* NGA-E Plan link to THJ
 
 
* FW ABF into CME codebase
 
* FW ABF into CME codebase
 
* Formalize the simulation plans for NR
 
* Formalize the simulation plans for NR
* Call with SD and KO on dynamic rupture
 
 
* Find images from CMU of circular GTL structures
 
* Find images from CMU of circular GTL structures
 
* Security Discussion with SC
 
* Security Discussion with SC

Revision as of 17:38, 6 January 2014

Yesterday:

  • Peace on Earth

Today:

  • DOE 2013 Final Report
  • SCEC EarthCube participation
  • Chair Palace

Blocked:

  • No

Followups:

  • UCVM meeting ()
  • BBP Meeting ()
  • CSEP Meeting ()
  • CyberShake Meeting ()
  • UCERF Meeting ()
  • High-F Update

Pending:

  • THJ and YC Call
  • FW ABF into CME codebase
  • Formalize the simulation plans for NR
  • Find images from CMU of circular GTL structures
  • Security Discussion with SC
  • Backup strategy with group
  • Setup license meeting with Stevens USC
  • Create Storage Map for SCEC Storage (SC)
  • Updated BBP and UCVM required docs to include "known problems" file