Difference between revisions of "Staff Priorities - Phil"

From SCECpedia
Jump to navigationJump to search
Line 3: Line 3:
  
 
== Today: ==
 
== Today: ==
* DOE 2013 Final Report
+
* DOE INCITE 2013 Final Report
 
* SCEC EarthCube participation
 
* SCEC EarthCube participation
* Chair Palace
+
* Visit Chair Palace
* SSA Abstracts
+
* SSA Abstracts Due Jan 10
 +
* UCVM email list (set group posting)
 +
* BBP Storage review
 +
* Update Calendars
 +
* Tom on NR products
  
 
== Blocked: ==
 
== Blocked: ==

Revision as of 17:59, 6 January 2014

Yesterday:

  • Goodwill towards others

Today:

  • DOE INCITE 2013 Final Report
  • SCEC EarthCube participation
  • Visit Chair Palace
  • SSA Abstracts Due Jan 10
  • UCVM email list (set group posting)
  • BBP Storage review
  • Update Calendars
  • Tom on NR products

Blocked:

  • No

Followups:

  • Director Candidate Practice
  • UCVM meeting ()
  • BBP Meeting ()
  • CSEP Meeting ()
  • CyberShake Meeting ()
  • UCERF Meeting ()
  • High-F Update

Pending:

  • THJ and YC Call
  • FW ABF into CME codebase
  • Formalize the simulation plans for NR
  • Find images from CMU of circular GTL structures
  • Security Discussion with SC
  • Backup strategy with group
  • Setup license meeting with Stevens USC
  • Create Storage Map for SCEC Storage (SC)
  • Updated BBP and UCVM required docs to include "known problems" file