Difference between revisions of "Staff Priorities - Phil"
From SCECpedia
Jump to navigationJump to searchLine 1: | Line 1: | ||
== Yesterday: == | == Yesterday: == | ||
− | * | + | * Holiday |
== Today: == | == Today: == | ||
Line 23: | Line 23: | ||
* CyberShake Meeting () | * CyberShake Meeting () | ||
* UCERF Meeting () | * UCERF Meeting () | ||
− | * High-F Update | + | * High-F Update () |
== Pending: == | == Pending: == | ||
− | |||
* FW ABF into CME codebase | * FW ABF into CME codebase | ||
* Formalize the simulation plans for NR | * Formalize the simulation plans for NR |
Revision as of 18:00, 6 January 2014
Contents
Yesterday:
- Holiday
Today:
- DOE INCITE 2013 Final Report
- SCEC EarthCube participation
- Visit Chair Palace
- SSA Abstracts Due Jan 10
- UCVM email list (set group posting)
- BBP Storage review
- Update Calendars
- Tom on NR products
- SCEC social media feedback
Blocked:
- No
Followups:
- Director Candidate Practice
- UCVM meeting ()
- BBP Meeting ()
- CSEP Meeting ()
- CyberShake Meeting ()
- UCERF Meeting ()
- High-F Update ()
Pending:
- FW ABF into CME codebase
- Formalize the simulation plans for NR
- Find images from CMU of circular GTL structures
- Security Discussion with SC
- Backup strategy with group
- Setup license meeting with Stevens USC
- Create Storage Map for SCEC Storage (SC)
- Updated BBP and UCVM required docs to include "known problems" file