Difference between revisions of "Staff Priorities - Phil"
From SCECpedia
Jump to navigationJump to searchLine 2: | Line 2: | ||
* Ricardo abstract | * Ricardo abstract | ||
* Fabio Abstract | * Fabio Abstract | ||
+ | * Feng's Abstract | ||
* CSEP Call | * CSEP Call | ||
* High-F Call | * High-F Call | ||
* CyberShake science call | * CyberShake science call | ||
− | * | + | * CME Meeting TJ (Wednesday 8am) |
+ | * BBP Pub plan call scheduled (Fri 830am) | ||
== Today: == | == Today: == | ||
* DOE INCITE 2013 Final Report | * DOE INCITE 2013 Final Report | ||
− | |||
* SCEC social media feedback | * SCEC social media feedback | ||
− | * BBP Storage | + | * BBP Storage plan developed |
+ | * Director Candidate Practice (Thursday 10:30am) | ||
== Blocked: == | == Blocked: == | ||
Line 17: | Line 19: | ||
== Followups: == | == Followups: == | ||
− | * | + | * |
− | |||
− | |||
− | |||
== Pending: == | == Pending: == |
Revision as of 18:19, 9 January 2014
Contents
Yesterday:
- Ricardo abstract
- Fabio Abstract
- Feng's Abstract
- CSEP Call
- High-F Call
- CyberShake science call
- CME Meeting TJ (Wednesday 8am)
- BBP Pub plan call scheduled (Fri 830am)
Today:
- DOE INCITE 2013 Final Report
- SCEC social media feedback
- BBP Storage plan developed
- Director Candidate Practice (Thursday 10:30am)
Blocked:
- No
Followups:
Pending:
- UCVM meeting ()
- CSEP Meeting ()
- UCERF Meeting ()
- High-F Update ()
- FW ABF into CME codebase
- Formalize the simulation plans for NR
- Find images from CMU of circular GTL structures
- Security Discussion with SC
- Backup strategy with group
- Setup license meeting with Stevens USC
- Create Storage Map for SCEC Storage (SC)
- Updated BBP and UCVM required docs to include "known problems" file