Difference between revisions of "Earthquake Response"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
'''Planning for ShakeOut'''
 
'''Planning for ShakeOut'''
  
'''Activities at SCEC'''
+
'''Earthquake Response Steps (Local/Universal)''
# Confirm operation of CISN Display at SCEC Headquarters
+
# Confirm operation of CISN Display at SCEC Headquarters (Local)
# Creation of Event Movie for ShakeOut Event
+
# Creation of Event Movie for ShakeOut Event (Universal)
 
## Recent Seismicity main-shock - 24 through mainshock
 
## Recent Seismicity main-shock - 24 through mainshock
 
## Faults plots CFM faults
 
## Faults plots CFM faults
 +
## Animation created
 +
## Animation posted at
  
# Physical location of Servers to check on power supply
+
#Confirm Information from Public
##
 
 
##
 
##
 +
 +
# Physical location of Servers to check on power supply (Local)
 +
## Physical inspection of server room (Local)
 +
  
 
'''Activities away from SCEC'''
 
'''Activities away from SCEC'''

Revision as of 17:28, 13 October 2010

Planning for ShakeOut

'Earthquake Response Steps (Local/Universal)

  1. Confirm operation of CISN Display at SCEC Headquarters (Local)
  2. Creation of Event Movie for ShakeOut Event (Universal)
    1. Recent Seismicity main-shock - 24 through mainshock
    2. Faults plots CFM faults
    3. Animation created
    4. Animation posted at
  1. Confirm Information from Public
  1. Physical location of Servers to check on power supply (Local)
    1. Physical inspection of server room (Local)


Activities away from SCEC

  1. Login into Event Response Web Site
  2. Movie of rupture
  3. Movie of earthquake