Difference between revisions of "Staff Priorities - Scott"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday ==
 
== Yesterday ==
*Finished work on KinModel code
 
*Posted some results from metrics scripts on Study 14.2
 
*Summer School call
 
*High F call
 
*CyberShake calls
 
*Signed form for Jun
 
  
 
== Today ==
 
== Today ==
*Fix issues with metrics scripts, post on wiki
+
*Finish gathering Study 14.2 metrics and post
*If Rob responds, move ahead with rupture generator
+
*Test Rob's modifications to rupture generator
*Outline list of tasks for 1 Hz
+
*Respond to Amit about SeedMe
 +
*Reply to Omar about metrics
 +
*Start drafting abstract for extreme scaling
  
 
== Blocked ==
 
== Blocked ==
Line 16: Line 12:
  
 
== Follow-ups ==
 
== Follow-ups ==
*Meeting with Phil later in week to discuss submission plan
+
*Summer school call
 +
*CyberShake calls
  
 
== Areas of Responsibilities ==
 
== Areas of Responsibilities ==

Revision as of 17:14, 25 March 2014

Yesterday

Today

  • Finish gathering Study 14.2 metrics and post
  • Test Rob's modifications to rupture generator
  • Respond to Amit about SeedMe
  • Reply to Omar about metrics
  • Start drafting abstract for extreme scaling

Blocked

  • No

Follow-ups

  • Summer school call
  • CyberShake calls

Areas of Responsibilities

  • CyberShake
  • Broadband CyberShake
  • Code migration