ERI Workshop ToDo
From SCECpedia
Jump to navigationJump to searchContents
Image Tasks Sept 15
- add basement and moho to image
- time runs using windows image and post results
- test japan configurations
- post link to image
- Create VB installation guid
BBP Tasks Monday Sept 15
- install new 6 stations xml files into image
- install SAC binary
- install bbp to sac script
- confirm processing that compares results against gmpe
SCEC-VDO Workshop Tasks Monday Sept 15
- Show AP/JS current display of basement and moho turf
- Confirm UTM conversion issue in SCEC-VDO
- Install basement andfiles in new image
- check 4.26 profiles
- configure cvm-h with and without gtl
- test horizontal slices at depths
- 0km
- 2.5km
- 5km
- 10km
- 20km
- 30km
- UCVM
- instructions on how to extract velocity slice at 5km and then visualize (should be on wiki?).
- produce 2 cross-sections (in UTM zone 11 coordinates X, Y)
- S-N: from St. Monica Bay across LA basin into St. Monica Mts. into San Fernando basin into San Gabriel Mts.
- 360000 m, 3747000 m to 360000 m, 3824000 m
- SW-NE: across center of LA basin into S.Gabriel Mts.
- 364227.734375 m, 3724462.73438 m to 425753.648438 m, 3797239.53125 m
- produce 3 vertical profiles from sealevel to 30km at
- center of LA basin: 389202.929688 m, 3757530.875 m
- San Fernando basin: 366000 m, 3788000 m
- western San Gabriel Mts.: 386677.617188 m, 3791082.85938 m
USR Exercises
- EQ catalog plugin
- Surface Plugin with image draped over topography
- Horizontal slices with negative depths