Staff Priorities - Kevin

From SCECpedia
Revision as of 17:08, 28 September 2015 by Kmilner (talk | contribs)
Jump to navigationJump to search

9/28/15

Yesterday:

  • finished MCEr code refactoring
  • implemented CB's proposed CyberShake/GMPE weighting algorithm:
    • average UCERF3 based GMPE calculations with UCERF2 based CyberShake calcs
    • 1s: full GMPE weight, 10s: full CyberShake weight. Will linearly interpolate between for now but make it easy to swap in other weighting functions
    • Apply weighted averaging directly to hazard curves (before RTGM calc) for probabilistic calcs, apply to spectrum for deterministic calculations.

Today:

  • implement MCEr calculations with UCERF3 based GMPE calcs
    • use Peter's deterministic UCERF3 ERF
  • if time, continue mapping of historical earthquakes to UCERF3 ruptures in order to run ETAS simulations of aftershock sequences

Blocked:

no

Followups:

no


Lower priority or longer term tasks

  • Fill in missing site/rupture distances in CyberShake DB for ERF 36 (200m)
  • finish mapping of historical earthquakes to UCERF3 ruptures in order to run ETAS simulations of aftershock sequences