Staff Priorities - Scott
From SCECpedia
Jump to navigationJump to searchYesterday
- Monitored database reloads - Study 15.12 successfully reloaded onto new production database
- Submitted peak amps from non-study data for reloading
- Verified all non-study data except peak amps reloaded on production database
- Sent Kevin list of sites to add to DB
- Asked John to update Condor on shock
Today
- Verify non-study peak amps successfully reloaded
- Add new index to production peak amps table
- Copy over condor config
- Verify new condor install is working
- Start inserting old studies into sqlite DBs
- Attempt test hazard curve at OSI with 1D model
Blocked
- No
Follow-ups
- No
Areas of Responsibilities
- CyberShake
- Broadband CyberShake
- Code migration