Blue Waters

From SCECpedia
Revision as of 18:17, 3 December 2012 by Maechlin (talk | contribs)
Jump to navigationJump to search


The table below summarizes the key parameters of the various Phases of the Blue Waters system. Phase 2 is expected to go into production in Summer 2012, and in Fall 2012, the Phase 3 system will have Kepler accelerators installed in the XK nodes. For more details, see the newly revised Blue Waters PRAC wiki page:

https://wiki.ncsa.illinois.edu/display/BWpublic/User+Information