Staff Priorities - Scott

From SCECpedia
Revision as of 18:03, 21 February 2012 by Scottcal (talk | contribs)
Jump to navigationJump to search

Yesterday

  • Narrowed down RWG 3D issue to input files; ran SMALL site to help with debugging
  • Got in trouble on Ranger
  • Got rupture geometries from Kevin for F2F ruptures
  • Checked

Today

  • Try Pegasus 4.0.0 with TEST curve
  • Run TEST curve with in-mem RV generation on Ranger
  • Run post-processing for full CS site with Kraken SGTs
  • Email Rob F2F ruptures, ask for thoughts

Blocked

  • No

Follow-ups

  • No

Areas of Responsibilities

  • CyberShake 1.4
  • Broadband CyberShake
  • Code migration