Staff Priorities - Fabio

From SCECpedia
Revision as of 16:00, 7 June 2012 by Fsilva (talk | contribs)
Jump to navigationJump to search

Yesterday:

Today:

  • Fling Study
    • Validate all the data from yesterday
  • Look at Rumi's updated runs
  • Back to Python
    • Finish removing GATech scripts
    • Sketch updated directory structure for plots/other scripts

Blocked:

  • No

Followups:

  • No

Ongoing:

  • Make trunk work both with and without site response
  • Look for ways to break up the GF directory layout, some ideas are:
    • First candidate is removing the plot directory from the GF directory
    • Create separate validation package
    • Separate events and codebases from each other