Staff Priorities - Fabio

From SCECpedia
Revision as of 16:34, 12 June 2012 by Fsilva (talk | contribs)
Jump to navigationJump to search

Yesterday:

  • Fling Study
  • Participated in the GMSV call
  • Met Phil to discuss Broadband development

Today:

  • Fling Study
    • Start scenario 139 (last one!)
    • Validate any scenarios that finish today (138, others from John?)
  • Create/update Trak issues
  • Meet with Phil to continue discussion on BBP development

Blocked:

  • No

Followups:

  • Meeting with Phil after standup call

Ongoing:

  • Make trunk work both with and without site response
  • Look for ways to break up the GF directory layout, some ideas are:
    • First candidate is removing the plot directory from the GF directory
    • Create separate validation package
    • Separate events and codebases from each other