Staff Priorities - Fabio

From SCECpedia
Revision as of 16:10, 14 June 2012 by Fsilva (talk | contribs)
Jump to navigationJump to search

Yesterday:

  • Fling Study
    • Verified Scenario 138
    • We are now 35/42
    • Filesystem issue on intensity (not due to Fling Study data, but because of a disk failure - /home/scec-01 was down)
    • Moved all our data from scec-01 to broadband-00 -- it is all in one place now
    • Created tar files for Ronnie to download
    • Updated wiki tables: http://scec.usc.edu/scecpedia/Fling_Study#Codebase_URS.2FURS.2FURS.2FURS
  • Created/updated few Trac issues
  • Looked up Agile development practices

Today:

  • Fling Study
    • Cannot start scenario 139 due to Friday downtime on intensity
    • Ping John Yu to find out about remaining scenarios
    • Validate any scenarios John has finished
  • Meet with Phil to discuss Christine's e-mail and dataset
  • Agile development briefing
  • GNSV call with science team

Blocked:

  • Cannot run more Fling scenarios till intensity's disks are restored

Followups:

  • Agile briefing at 1pm
  • GNSV call at 2pm
  • Phil to discuss Christine's e-mail and dataset @ TBD

Ongoing:

  • Make trunk work both with and without site response
  • Look for ways to break up the GF directory layout, some ideas are:
    • First candidate is removing the plot directory from the GF directory
    • Create separate validation package
    • Separate events and codebases from each other